Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T20PI00024
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/16/2021 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
02/16/2021 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
02/16/2021 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
02/16/2021 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
02/16/2021 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
02/16/2021 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
02/16/2021 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
02/16/2021 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
02/16/2021 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
03/09/2021 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | See engineering review comments |
03/09/2021 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
03/09/2021 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | March 9, 2021 SUBJECT: La Estancia Phase II, Parcel 4 Paving Plans PROJECT REVIEWER: Richard Leigh, DTM Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments. 1. Sheet 10: Keynote 8 Indicate grate size, EF-1 or EF-2. 2. Sheets 10: Keynote 31 references a detail on sheet 3 that is not included. 3. Provide a keynote for the proposed catch basin at 11+28.28 15' RT, Camino Estarna. 4. The City of Tucson does not require STOP signs at T intersections, see PCDOT/COT Signing and Marking Standards Sheet 8.15. Revise plan set to reflect this. 5. Indicate placement of street name signs at roadway knuckles. 6.Indicate placement of No Parking signs at frequency of approximately 100' along the parking restriction zones. |
03/09/2021 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |