Review Details: PIA - SUBMITTAL
Plan Number - T20PI00023
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/06/2021 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Reqs Change | DTM Landscape: 1. Add the following notes to the plans and comply with all requirements listed in notes. City of Tucson, Department of Transportation and Mobility Requirements for placement of Private Irrigation Facilities Roadway Crossings within the Public Rights-of-Way 1. Private irrigation facilities roadway crossings will only be permitted in residential roadways and NOT permitted in arterial or collector roadways. 2. Lateral lines under constant pressure shall not be permitted in the public rights-of-way. 3. The HOA/Owner will register private irrigation facilities placed in the public rights-of-way with Arizona 811and become an Arizona 811 Blue Stake Inc. member. 4. Minimize the number of roadway crossings. 5. Sleeves must be in a recorded easement (easement width is dependent on what is needed for installation and/or repairs). To the extent possible, the easements should be created at the time of development/platting. 6. Irrigation lines shall be placed in ductile iron sleeves. 7. Sleeve should extend beyond the right-of-way (into private property), unless otherwise approved by TDOT. 8. HDPE continuous line (no joints under the pavement) 9. Irrigation lines shall have a minimum of thirty (30) inches of cover. 10. Detectable marking tape shall be installed. 11. Curb shall be marked/stamped with "IS" (Irrigation System) and/or placard at back of curb. Thank you, David David Marhefka Landscape Architect City of Tucson Department of Transportation and Mobility (o) 520-837-6618 (m) 520-403-5074 |
01/06/2021 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | |
01/06/2021 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
01/06/2021 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | Please submit utility notification confirmation for the utility companies listed on the PIA utility notification list. The list can be found at: https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines |
01/06/2021 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
01/06/2021 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Approved | |
01/06/2021 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | January 4, 2020 SUBJECT: La Estancia Phase II, Parcel 5 Paving Plans PROJECT REVIEWER: Richard Leigh, DTM Eng. Review RESUBMITTAL REQUIRED: DTM Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments. 1. Add the plan number "I-2020-025" in the title block of each sheet. 2. Add PIA activity number "T20PI00023" on coversheet. 3. Sheet 2: Paving Note 5 to indicate that the asphaltic concrete shall conform to PAG's Replacement Specification for Section 406 Asphaltic Concrete, dated December 12, 2019. 4. Sheet 2 through 11: Use current DTM title blocks. See Engineering Plan Template at: https://www.tucsonaz.gov/files/transportation/Engineering_Plan_Templates_Dec_2019.pdf 5. Sheets 3: Revise scupper detail to indicate placement of barricade railing along the back of the scupper. 6. Sheets 3: Verify the data provided in the Scupper Information Table, revise as necessary. 7. Sheets 4: Curb access ramps will have to be provided at the intersection of Via De Ayante and Camino Vista Azul. Refer to COT TSM Section 10-01.3.3.E 8. Sheets 5: Curb access ramps will have to be provided at the intersection of Via De Ayante and Camino Cardal. Refer to COT TSM Section 10-01.3.3.E 9. Sheets 9: Curb access ramps will have to be provided at the intersection of Caminito La Piscins and Camino Cardal. Refer to COT TSM Section 10-01.3.3.E 10. Refer to redline drawings for additional comments and comment details. If you have any questions, I can be reached at 520-237-8692 or emailed at Richard.Leigh@tucsonaz.gov. |
01/06/2021 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | Please submit utility notification confirmation for the utility companies listed on the PIA utility notification list. The list can be found at: https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines |
01/06/2021 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
01/06/2021 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
01/06/2021 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
01/06/2021 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
01/06/2021 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
01/06/2021 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
01/06/2021 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
01/06/2021 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review |