Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T20PI00016
Review Name: PIA - SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/06/2020 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
| 10/06/2020 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | |
| 10/06/2020 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | 1. Sheet 3: Consider placing the R4-4 sign closer to the start of the right turn lane taper 2. Sheet 3: We note that the 50' right turn lane taper was approved on 5/14/20 by Administrator Blake Richards in previous discussions to avoid conflict with the existing power pole Reviewer: Greg Orsini, P.E. Gregory .Orsini@tucsonaz.gov 520-837-6617. |
| 10/06/2020 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 10/06/2020 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
| 10/06/2020 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Approved | |
| 10/06/2020 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | October 6, 2020 SUBJECT: OFFSITE IMPROVEMENT PLAN FOR 4650 S PARK AVENUE RIGHT TURN IMPROVEMENT PLANS PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Engineering Review Section has reviewed the subject PIA paving plan and recommends a conditional approval of the drawings. The following comments need to be addressed and plans revised prior to submitting mylars for signatures. 1. Include the plan number “I-2020-016” in the title block of each sheet. 2. Include the PIA activity number “T20PI000016” on cover sheet. 3. Sheet 1: Revise note 21 to specify revised PAG Specification dated 12/18/2019. See revised specification at http://apps.pagnet.org/standardspecifications/Updates/2019-2-Section-406-Asphaltic-Concrete-Pavement-Oct-31-2019.pdf 4. Sheet 2: Provide a place holder for recording sequence number (to be filled in with record drawing). If you have any questions, I can be reached at 520-2378692 or emailed at Richard.Leigh@tucsonaz.gov. |
| 10/06/2020 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
| 10/06/2020 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
| 10/06/2020 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
| 10/06/2020 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
| 10/06/2020 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
| 10/06/2020 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
| 10/06/2020 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
| 10/06/2020 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
| 10/06/2020 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review |