Plan Number: T20PI00014
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T20PI00014
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/13/2020 GARY WITTWER DOT LANDSCAPE REVIEW Reqs Change Hello John, I plan on reviewing the Old Nogales Interceptor Phase 2 project and pia reviews.
1. Place the following notes on sheet 2

Requirements for placement of Private Irrigation Facilities Roadway Crossings within the Public Rights-of-Way

- Lateral lines under constant pressure shall not be permitted in the public rights-of-way.

- The HOA will register private irrigation facilities placed in the public rights-of-way with Arizona 811and become an Arizona 811 Blue Stake Inc. member.

- Irrigation lines shall be placed in ductile iron sleeves.

- Sleeve should extend beyond the right-of-way (into private property), unless otherwise approved by DTM.

- Private Irrigation lines within the private irrigation easement shall be a continuous line (no joints under the pavement)

- Irrigation lines shall have a minimum of thirty (30) inches of cover.

- Detectable marking tape shall be installed.

- Curb shall be marked/stamped with "IS" (Irrigation System) and/or placard at back of curb.

2. Change keynote 12 to Ductile Iron Pipe sleeve.
11/13/2020 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Needs Review
11/13/2020 RICHARD LEIGH DOT ENGINEERING REVIEW Approved
11/13/2020 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Needs Review
11/13/2020 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Needs Review
11/13/2020 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Needs Review
11/13/2020 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Needs Review
11/13/2020 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Needs Review
11/13/2020 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Needs Review
11/13/2020 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Needs Review
11/13/2020 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Needs Review
12/09/2020 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed Submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way at the following link.
12/09/2020 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed Submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way at the following link.