Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T20PI00010
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/27/2020 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
07/27/2020 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | |
07/27/2020 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | Reviewer: Greg Orsini, PE Traffic Eng. Mgr. GREGORY.ORSINI@TUCSONAZ.GOV 520-268-5036 1. The right turn storage length is substandard for a posted speed of 45 mph (Sheet 4-7 of COT/PC Pvmt Marking Manual calls for 150 feet of storage). I am assuming this is because they want to avoid the existing power pole to the north and use the existing bus bay for the right turn lane. 2. Is SunTran aware of and on-board with the use of this bus bay as a right turn lane? Is this location even in-use as a bus stop? Google Streetview shows a concrete pad at the back of sidewalk, but no signage or bench indicating a bus stop location. 3. A marked crosswalk should be 10' wide, centered around the curb access ramps. Or even better, for this location the crosswalk across the driveway should not be marked. 4. Note 6: longitudinal striping should be 90 mil (0.090"), not 60. |
07/27/2020 | RICHARD LEIGH | DOT PERMITS & CODES | REVIEW | Reqs Change | Bea Paulus Programs & Projects Manager Sun Tran 520-206-8826 bea.paulus@tucsonaz.gov This pullout was built for future use by Sun Tran, when the Houghton Rd project is complete. We have combination bus stop/right turn lane throughout the Sun Tran service area. Ideally, we request enough clearance (100') between the actual bus stop (front bumper of the stopped bus) and the intersection. SB Houghton right turning vehicles should have the clearance to move into the right turn lane, in front of the stopped bus, before turning right, and traffic coming out of the Saguaro Trails neighborhood should have visibility to monitor southbound traffic for safe right turns into SB Houghton traffic. Thank you. |
07/27/2020 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
07/27/2020 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Approved | |
07/27/2020 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | July 13, 2020 SUBJECT: Offsite Improvements Plan For Encantada at Saguaro Trails PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments and return redlined drawings with subsequent submittal. 1. Add the plan number "I-2020-011" in the title block of each sheet. 2. Add PIA activity number "T20PI00010" on cover sheet. 3. Add Administrative address and development plan number on cover sheet. 4. Sheet 2: Provide a dimensioned detail of the proposed curb access ramps at new driveway entrance. Additionally, indicate that the asphalt path may need to be adjusted to meet the cross slope of the curb access ramp. 5. Sheet 2: Indicate placement of an expansion joint at PCCP and curb connection and provide a detail. 6. Sheet 3: Revise sections 1 and 2 to indicate pavement cross slope. 7. Indicate placement of two 4" PVC Schedule 40 sleeves across driveway Per PAG S.D 400 for existing irrigation lines. 18. Please Refer to redline plans for additional comments and comment details If you have any questions, I can be reached at 520-237-8692 or emailed at Richard.Leigh@tucsonaz.gov. |
07/27/2020 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
07/27/2020 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
07/27/2020 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
07/27/2020 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
07/27/2020 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
07/27/2020 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
07/27/2020 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
07/27/2020 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review | |
07/28/2020 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
07/28/2020 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |