Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T20PI00008
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/14/2020 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
07/14/2020 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | |
07/14/2020 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | Reviewer: Greg Orsini, P.E. Gregory .Orsini@tucsonaz.gov 520-837-6617 1. - Sheet 2, Pavement Marking Note 6: Final longitudinal striping shall be 90 mil (0.090") thick extruded thermoplastic striping, NOT 60 mil hot-sprayed. 2. - Sheet 2, Pavement Marking Note 7: Eliminate the two references to "hot-sprayed" thermo 3. - Sheet 2, Signing Note 6: Add sentence to the end of this note stating something like "All Stop signs, Yield signs, and overhead regulatory signs shall also be Type XI sheeting." |
07/14/2020 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Approved | |
07/14/2020 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | July 13, 2020 SUBJECT: Offsite Improvements Plan for The Bridges B-1 PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments and return redlined drawings with subsequent submittal. 1. Add the plan number "I-2020-010" in the title block of each sheet. 2. Add PIA activity number "T20PI00008" on cover sheet. 3. Sheet 4: Indicate that the minimum pavement width at the beginning of the pavement taper shall be 2'. 4. Sheet 4: Indicate that the streetlight conduits and pull boxes will relocated behind the new curb line. 5. Sheet 4: Provide grading details and proposed final surface treatment adjacent to the multi-use path. The area must be graded to prevent soils from washing onto the path. 6. Sheet 4: The area where the proposed right turn lane, streetlights and other roadway facilities encroach onto private property will have to be dedicated to the City as public right-of-way. 7. Sheet 4: Provide vertical curve data for the right turn lane profile. 8. Sheet 4: Provide horizontal curve data for the proposed curb returns. 9. Sheet 4: Has a photometric analysis been performed to determine the lighting impacts of relocating the streetlights east of the multi-use path? 10. Sheet 6: Verify ROW location depicted on sections "E" and "F". 11. Sheet 6: Revise sections "E" and "F" to depict new pavement section and call out that the existing pavement will be saw cut, tacked and joined. 12. Please Refer to redline plans for additional comments and comment details If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
07/14/2020 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
07/14/2020 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
07/14/2020 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
07/14/2020 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
07/14/2020 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
07/14/2020 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
07/14/2020 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
07/14/2020 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review | |
08/04/2020 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
08/04/2020 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
08/04/2020 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |