Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T20CM09121
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/20/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
04/26/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide smoke detectors for RTU-3, in the return air duct, upstream of any filters or outside air connections. Reference: Section 606.2.1, IMC 2018, as amended by the City of Tucson. 2. Show how the smoke detector will comply with the supervisory requirements of Section 606.4.1, IMC 2018. |
04/26/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The fixture drain serving an automatic clothes washer shall connect to a fixture branch that is at least 3 inches in diameter. Reference: Section 406.2, IPC 2018. 2. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503.1, 504, 606.1, 607.2, and 607.3, IPC 2018. 3. Provide cleanouts for all horizontal drains (e.g. the horizontal drain serving the fixture drains for SK-2 and WMB); the cleanouts shall be sized per Section 708.1.7, IPC 2018 and shall open to allow cleaning in the direction of flow. Reference: Sections 708.1.1 and 708.1.8, IPC 2018. 4. Provide cleanouts sized for the nominal size of pipes that they serve up to 4-inches. Reference: Section 708.1.5, IPC 2018. |
04/29/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A102; Wall Type Legend: Please indicate the metal stud gauge for W4 and W6 in the Legend. 2. Sheet A103; Sections 2 and 4: At the top of the partitions, please indicate the bracing size, spacing, and the connector size and quantity at the top of the partition and at the roof. 3. Sheet A103; Section 3: This partition does not indicate any bracing at the top. Please indicate on the Section how the partition will resist the horizontal loads per the IBC Section 1607.15. Provide structural calculations as required. 4. Sheet A200; Roof Plan Notes: Note 4 indicates a new RTU. Please indicate on this sheet a comparison of the new RTU (1870 pounds) and the existing RTU. If the new unit weights more than the existing, provide structural calculations to confirm the existing roof structure can support the heavier RTU. 5. General: Please provide a valuation (labor + materials) for the revised scope on this project. 6. General: Please provide written responses to all review comments. |
05/11/2021 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
05/11/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please submit revised electrical plans. |
05/11/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/12/2021 | IMONSHI1 | APPROVAL SHELF | Completed |
05/12/2021 | IMONSHI1 | OUT TO CUSTOMER | Completed |