Review Date Reviewer's Name Type of Review Description Status Comments
04/05/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheets S-2, S-3, S-4, and S-5: These drawings must be sealed, signed, and dated by a registered design professional per the 2018 IBC Section 107 (Sheet S-1 is sealed, signed, and dated in a separate drawing). Please provide.
04/05/2021 ROBERT SHERRY WATER REVIEW Reqs Change A development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Also, incomplete plans (i.e. plans marked, “NOT FOR CONSTRUCTION”) are not acceptable. Provide a site plan showing the location of the proposed water meter, backflow preventer, and the water service pipe to the building. [Initial comment: Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018.]
04/05/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change A development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Also, incomplete plans (i.e. plans marked, “NOT FOR CONSTRUCTION”) are not acceptable. Provide a site plan showing the installation of the water service to the building and the installation of the building sewer. [Initial comment: Provide a site plan showing the installation of the water service to the building and the installation of the building sewer. Specify the materials of construction. Reference: Sections 104.2 and 107.2.1, IBC 2018.]
04/08/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following Electrical Plan Review comments. Provide a written response.

. Designing the site Electrical constitutes the practice of engineering. Provide plans sealed by an Arizona Registrant. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304

Provide Energy calculation utilizing the current 2018 IECC. Provide for energy reduction for the lighting if required.

Provide compliance with the 2012 Tucson/Pima County Outdoor Lighting Code. Can be downloaded or printed from www.tucsonaz.gov/pdsd.

Provide complete total building load calculations.

Additional comments may be generated for the subsequent electrical plan review.

Ref; 2018 IBC sec 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. Tucson/Pima County Outdoor Lighting Code
04/14/2021 LOREN MAKUS ENGINEERING REVIEW Reqs Change DEVELOPMENT PACKAGE MUST BE APPROVED FIRST.
04/20/2021 STEVE SHIELDS ZONING REVIEW Approved
04/20/2021 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved