Permit Number: T20CM08811
Parcel: 12511196A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM08811
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2021 NMARTEL1 ZONING REVIEW Approved
12/16/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
12/17/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Show the size, route, and termination of the dryer exhaust duct. Reference: Sections 504.1, 504.2, 504.4 and, 504.6, IMC 2018.
2. Show how the clothes dryer exhaust duct maintains the fire-resistance-rating of the floor-ceiling assemblies that it penetrates. Reference: Section 504.2, IMC 2018.
12/17/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A-3; General Notes: Note 4 references Sheet A-9 for the finish key. Please revise that reference.
2. Sheet A-4; Partition Types: Please provide the metal stud gauge and spacing for the B1 Partition.
3. Sheet A-4; Partition B1: Please provide the diagonal bracing gauge and spacing. In addition, indicate the number and size of the connectors for the bracing to the top of the partition and to the structure above.
4. Sheet A-4; Partition Types: The Table indicates Partitions B2 and B3. Where are those partitions located on the Floor Plan (Sheet A-1)?
5. Sheet A-6; Pony Wall Plan: Please indicate the metal stud gauge and spacing for the pony wall.
6. General: Please provide a valuation (labor + materials) for this project.
7. General: Please provide written responses to all review comments.
12/17/2020 ROBERT SHERRY WATER REVIEW Completed
12/17/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2018.
12/17/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
12/21/2020 SBLOOD1 ENGINEERING REVIEW Passed
12/22/2020 JPEELDA1 FIRE REVIEW Approved