Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM08635
Parcel: Unknown

Address:
108 S CHURCH AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM08635
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/12/2021 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
01/12/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
01/12/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet T1.0; Building Occupancy: Although the IBC Section 303.1.1 allows Assembly Groups with less than 50 occupants to be classified as a Group B Group, the IBC Table 1004.5 determines the Occupant Load Factor based on the function of the space (in this case a Restaurant A-2). Rather than using the Occupant Load Factor of 15 SF/occupant, you can use the number of seats indicated on the floor plan. You may not use the 150 SF/occupant for a Group B Occupancy. Please verify.
2. Sheet T1.0; Plumbing Fixture Calculations: Please verify the occupant load is 15 or less to meet the requirement of a single restroom. Since there is not a change of use, but appears to be an increase in occupant load, a discussion with the Building Official would be warranted. You can contact him at Clayton.Trevillyan@tucsonaz.gov.
3. Sheet A1.0; Wall Schedule (Walls 1, 2, and 3): Please indicate the metal wall stud gauges.
4. Sheet A1.0; Floor Plan: The Occupant Load from Sheet T1.0 indicates 9. The Floor Plan indicates 5 seats in the Service Area, 2 seats in Seating 1 Area, 4 seats in Seating 2 Area, and an unspecified number of occupants on the benches in Seating 3 Area. Please confirm and/or revise the occupant load for this building.
5. General: Please provide a valuation for this projecct.
6. General: Please provide written responses to all review comments.
01/15/2021 SAMUEL ROGERS ZONING REVIEW Approved
12/10/2020 DTRAMME1 ENGINEERING REVIEW Passed
12/21/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Provide structural calculations to show that the 50-gallon water heater will be safely supported from the building structure (i.e. will the wall support the water heater and shelf-). Reference: Section 301.2, IPC 2018.
12/21/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
12/21/2020 ROBERT SHERRY WATER REVIEW Completed
12/30/2020 JPEELDA1 FIRE REVIEW Approved