Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM08453
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/06/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. A floodplain use permit is required. Please use the permit application portal to submit the floodplain use permit application. 2. Along with the permit application provide a complete cost estimate for the project. |
| 12/03/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Update Code references to the currently adopted 2017 NEC and 2018 Building Codes. Remove references to the IRC. 2. Identify what equipment and devices are new and existing. 3. Provide a complete Panel schedule including load calculations and a complete line diagram if the panel is new. 4. Provide disconnecting means for all mechanical equipment include the water heater. 5. Designate a branch circuit number and panel for all electrical devices and equipment that also correlates with the panel schedule. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
| 12/07/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The 2018 International Mechanical Code and the 2018 International Energy Conservation Code, both with Local Amendments are the relevant codes for this project. 2. Demonstrate energy code compliance for the alterations to the building envelope using calculations based on the current code. Reference: Sections C103.2, C303, C503.1, and C503.3, International Energy Conservation Code 2018. 3. Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Beauty Salons require general exhaust as well as outside air supply. Reference: Section 403.3.1.1, IMC 2018. 4. Show the size, route, and termination of the dryer exhaust duct. Reference: Sections 504.1, 504.2, 504.4 and, 504.6, IMC 2018. |
| 12/07/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 12/07/2020 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Relocate the existing reduced pressure backflow prevention assembly. Reduced pressure backflow prevention assemblies are required to be installed in locations accessible to Tucson Water. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf 2. Provide the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. |
| 12/07/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The International Plumbing Code, 2018, is the controlling code for this structure, not the International Residential Code. Reference: Section 101.2, IPC 2018. 2. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2018. 3. Provide the third-party listing information for the specified shampoo sinks. Reference: Section 303.4, IPC 2018. 4. The fixture drain serving an automatic clothes washer shall connect to a fixture branch (e.g. the clothes wash that is at least 3 inches in diameter. Reference: Section 406.2, IPC 2018. 5. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference: Section C404.3, IECC 2018. 6. Revise the water heater detail to include the expansion tank and valves. Reference: Sections 503.1, 606.1, and 607.3, IPC 2018. 7. Provide pressure-absorbing devices (e.g. water hammer arrestors) for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. clothes washers). The pressure-absorbing devices shall conform to ASSE 1010; an air chamber is not acceptable. Reference: Section 604.9, IPC 2018 8. The maximum number of fixture units for a horizontal branch of a building drain shall not exceed that shown in Table 710.1 (1), IPC 2018. Two sinks at 2 drainage fixture units each requires a 2" horizontal branch. 9. The installation of building (house) traps is prohibited. Reference: Section 1002.6, IPC 2018. |
| 12/07/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet 1; Building Code: References are made to the 2012 International Codes and to the 2011 NEC. Please revise the International Codes to the 2018 Edition, and the NEC to the 2017 Edition. Verify the drawings meet the requirements of those updated codes. 2. Sheet 1: A Code Analysis must be indicated on this sheet. Provide the building square footage, the Occupancy Classification (IBC Section 304.1), the Construction Type (IBC Section 602), the Occupant Load (IBC Table 1004.5), automatic sprinkler requirements (IBC Section 903), Exit requirements (IBC Section 1006.2.1), the Common Path of Egress Travel Distance (IBC Table 1006.2.1), and required Plumbing Fixtures (IBC Table 2902.1). This information is required to obtain a Certificate of Occupancy. 3. General: It is not clear on these sheets when the seal and signature are dated. Please provide. 4. General: Please provide a project valuation (labor + materials). 5. General: Please provide written responses to all review comments. |
| 12/10/2020 | SAMUEL ROGERS | ZONING | REVIEW | Approved | |
| 12/16/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Project shows that they are using the 2012 codes. Change codes to 2018. Also please note if building has fire sprinklers and or fire alarm. |