Permit Number: T20CM07995
Parcel: Unknown

Address:
3550 E CORONA RD

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T20CM07995
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/20/2021 STANTEC 2ND PARTY REVIEW REVIEW Reqs Change ARCHITECTURAL COMMENTS
Sheet A-000.1
1. Some new sheets have been added to the revised set of drawings. Some of these sheets
are missing from the List of Drawings; specifically, Sheets S5.7, P-006, and E-107; please
update. {E-106 is also missing from the List of Drawings.}
Sheet A-307
1. The currently approved permitted sheet has a Delta 2 dated 3/11/21, whereas the
“revised” sheet has a Delta 1B dated 2/19/21. When comparing these sheets further,
there is no discernable difference in the information contained. Please clarify.
Sheet A-400
1. Sheets A-405 thru A-409 have been removed and replaced by Sheets A-405A thru A-
405C and A-406A thru A-406C. While reviewing the new hardware schedules on Sheets
A-406A thru A-406C, they appear to align with the hardware within the Interior Door and
Frame Schedule. For example, Hardware Set TI-9A within the Interior Door and Frame
Schedule exists in the hardware schedules on Sheets A-406A thru A-406C. However,
none of the nomenclature in the hardware sets on Sheets A-405A thru A-405C align with
any of the door schedules. For example, where does Hardware Set S-02D occur in the
door schedules? Please coordinate.
STRUCTURAL COMMENTS
Sheets S2.1 and S2.2
1. There are new foundation elements indicated on the foundation plans (i.e., what appears
to be steel posts bearing on the slab and MHE column footings identified by Detail 20 on
Sheet SD2), where are the calculations for these foundations? Do these foundations
support raised equipment platforms? If so, where is the design for these raised equipment
platforms? Are these raised equipment platforms to be added to this permit’s list of
deferred submittals, or will they be part of some future tenant improvement? Please
clarify.
MECHANICAL COMMENTS
There are no comments.
PLUMBING COMMENTS
There are no comments.
ELECTRICAL COMMENTS
Sheets E-100 and E-106
1. The enlarged plans on Sheet E-106 do not match the site plan on Sheet E-100; please
coordinate. {Is the proposed Truck EV distribution equipment and utility company
transformer within the yard fence or is it not?}

Final Status

Task End Date Reviewer's Name Type of Review Description
04/20/2021 ARUIZ1 OUT TO CUSTOMER Completed