Permit Review Detail
Review Status: Completed
Review Details: WALK THRU - COMM
Permit Number - T20CM07789
Review Name: WALK THRU - COMM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/16/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Addition of AC units to the triplex will require a heating/cooling load calculation to justify the capacities of the units being installed (Sections R403.7, IECC 2018). The units themselves will also have to comply with Sections R403.1 and R503.1.2, IECC 2018 for efficiency, controls, and ductwork. Replacement of evaporative cooling units will require the ventilation of the dwellings to meet the current ventilation requirements shown in Section 403.3.2, IMC 2018. A test and balance report is required to verify that the ventilation air flow rates comply with the code requirements |
| 11/16/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide a complete diagram of the natural gas distribution system showing the all of the loads, developed lengths, and the layout of the distribution piping. Reference: Section 402.2, IFGC 2018. |
| 12/10/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide complete electrical plans. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
| 12/14/2020 | KROBLES1 | BUILDING-COMMERCIAL | REVIEW | Passed | N/A |