Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM07637
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/04/2020 | DTRAMME1 | ENGINEERING | REVIEW | Passed | |
11/19/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Specify that all proposed plumbing fixtures shall be listed by a third-party certification agency as complying with the relevant standards. Reference: Section 303.4, IPC 2018. 2. The developed length of the hot water supply piping appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2018 and C404.5, IECC 2018. |
11/19/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. What is the purpose of the "Fixture Shop" and why is the area being exhausted? Is there adequate make-up air to offset the exhaust flow rate? Reference: Section 107.2.1, IBC 2018 and Section 501.4, IMC 2018. 2. What are the activities being performed in the MI room? Reference: Section 107.2.1, IBC 2018. |
11/19/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
12/02/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
12/02/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
12/02/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide complete compliance with the currently adopted 2018 IECC for the lighting. Ref; 2018 IECC |
12/02/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
12/22/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved |