Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T20CM07131
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/28/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: T20CM07131 2826 E Malvern St Detached Pool House Residential (1st Review) TRANSMITTAL DATE: October 28, 2020 This site is located in the R-1 zone (UDC 4.7.8). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.5 – 9. Per Unified Development Code (UDC) Article 6.4.5.B.1 perimeter yard setbacks are based on a measurement from the highest point of the wall to design grade. 1. As a wall height from the highest point of the wall was not provided on the east elevation Zoning cannot verify required perimeter yard setbacks from the pool house to the east property line. It appears that the height may be 12’-0” which requires an 8’-0” perimeter yard setback. Either move the proposed pool house to meet perimeter yard setback or provide a neighbor setback waive on the plan. If you elect to use the setback waiver provide the following statement on the plot PLAN and have the owner of the property to the east sign and date: “My Name is and I am the owner of the property located at . I have reviewed the site plan and I have no objection to structure being located or constructed from the property line as depicted on the site plan. 2. Remove all reference to a kitchen from the plans as the lot size does not support have a 2nd unit on the site. 3. Label the propose refrigerator and “UNDER COUNTER REFRIGERATOR ONLY”. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 10/28/2020 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 10/28/2020 | SSHIELD1 | NPPO | REVIEW | Passed | |
| 11/19/2020 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Completed |