Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM07017
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/14/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/14/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide construction documents that are complete and clearly indicate the extent of the proposed work (e.g. does the existing HVAC system have a return air plenum or are the new return grilles being ducted to the existing rooftop AC units). Reference: Section 107.2.1, IBC 2018. 2. Demonstrate energy code compliance for the alterations to the building envelope (e.g. the enclosure of the existing atrium) using calculations based on the current code. Reference: Sections C103.2, C303, C503.1, and C503.3, International Energy Conservation Code 2018. 3. Provide calculations to verify that adequate ventilation will be provided for the revised spaces. Reference: Section 403.3.1.1, IMC 2018. 4. Provide balancing data for each modified HVAC system to ensure that adequate ventilation air is being distributed to all occupied areas and that the egress corridors are not being used as ducts. Reference: Sections 403.1, 403.3.1.5, 601.2 and 601.5 (3), IMC 2018. 5. Show the size, route, and termination of the dryer exhaust duct. Reference: Sections 504.1, 504.2, 504.4 and, 504.6, IMC 2018. |
10/14/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2018. 2. Provide specifications for all new plumbing fixtures being installed. Reference: Sections 303.4 and 402, IPC 2018. 3. The fixture drain serving an automatic clothes washer shall connect to a fixture branch that is at least 3 inches in diameter. Reference: Section 406.2, IPC 2018. 4. Provide roof drainage and scupper size calculations based on the 100-year hourly rainfall rate for Tucson, 3" per hour. Provide dimensions for the proposed scupper. Reference: Sections 1101.7, 1106, and 1108, IPC 2018. 5. The new storage room (101) does not have a means of secondary roof drainage. Provide structural calculations to show that the canopy can safely support the maximum possible water depth caused by ponding if the primary roof drains are assumed to be blocked. Reference: Section 1101.7, IPC 2018. |
10/14/2020 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. |
10/14/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet C1; Codes Applicable: Please revise the codes as required, and add the 2009 ICC/ANSI A117.1 Accessibility Code. 2. Sheets A2, A3, and A4; Wall Types: Please indicate the metal stud gauge for Wall Types A and C. 3. Sheets A2, A3, and A4; Detail A: Per the IBC Section 1607.15, interior partitions shall have adequate strength to resist a horizontal load of 5 PSF. Please indicate top of the partition bracing size and spacing, and how it is connected to the top of the partition and to the structure above (quantity and size of connector). 4. Sheet A4; Atrium Roof Enclosure Plan: Please indicate where this plan is located on the Area C Floor Plan. 5. Sheet A4; Atrium Roof Enclosure Plan: Please provide structural calculations for this roof enclosure, and add sections as required. 6. General: Please provide a project valuation (labor + materials). 7. General: Please provide written responses to all review comments. |
10/15/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide compliance with the 2018 IECC for the lighting. 2. Provide a note on the power plans to comply with NEC 517.13 for wiring methods in patient care areas. 3. Provide a note for the contractor to accurately update the panel schedules branch circuit directory as required per NEC 408.4. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
10/22/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Plan set shows the 2012 code cycle not the 2018 code that we have adopted. Cover sheet indicates fire sprinklers but not that they are deferred Cover sheet does not indicate that there is a fire alarm system and that should be noted as deferred as well. Please modify the plans and resubmit |
10/23/2020 | SAMUEL ROGERS | ZONING | REVIEW | Reqs Change | FROM: Samuel Rogers – Planner PDSD Zoning Review Section PROJECT: T20CM07017 Remodel (1st Review) 818 N Montezuma Av TRANSMITTAL DATE: 10/23/2020 DUE DATE: 10/07/2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: Site work on a commercial site requires a Development Package. For Development Package requirements see: https://www.tucsonaz.gov/pdsd/all-application-forms-submittal-requirements If you have any questions about this transmittal, contact Samuel Rogers at Samuel.Rogers@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans |
10/26/2020 | SBLOOD1 | ENGINEERING | REVIEW | Approved |