Permit Number: T20CM06847
Parcel: 14111030B

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T20CM06847
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/20/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
10/20/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
10/20/2020 ROBERT SHERRY WATER REVIEW Passed
10/21/2020 JPEELDA1 FIRE REVIEW Reqs Change This building will have a “fire-flow calculation area”(2018 IFC Appendix B, Section B102 and 105.1) greater than 3,600 sq. ft.: therefore this building will require a sprinkler system unless the fire flow in the nearest hydrant is a minimum of 2,000 GPM for 2 hours duration at 20 psi residual pressure. Additionally, the hydrant must be within 400’ of all parts of the building without fire sprinklers. Contact Tucson Water engineering for a hydraulic analysis. Fred.Coy@Tucsonaz.gov Provide notes on plan regarding verification of fire flow and proximity of hydrant or intent to install a fire sprinkler system. Both items shall be met. Hydrant length can increase to 600' for a sprinklered building.
10/21/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Provide for a grounding electrode system UFER as required per NEC art 250.50
Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements.
10/26/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Section Manager

PROJECT: T20CM06847
Optimum AZ Metal Building
8500 E Old Vail Rd

TRANSMITTAL DATE: October 26, 2020

DUE DATE: October 26, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. Zoning has reviewed the building plans for compliance with DP20-0159 and it appears to in compliance but cannot approve the building plans until the DP is approved and the building plans have been approved by all other PDSD review agencies.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
11/09/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet C1 (Code Review); Structural Calculations (Cover and Other Sheets): The Code Review indicates 5100 SF for the building area, while the structural calculations indicate a 50' x 120' building. Please coordinate.
2. Sheet S3; Detail 1: The column footing does not indicate a footing size (indicates "Width"), and the Foundation Plan has no Keynote that indicates the foundation size. Please indicate on the drawings, as inspectors will not review calculations for that information.
3. General: All structural members (deck, purlins, girts, lintels, beams, columns, frames, etc. must indicate connections on the drawings, as inspectors will not review calculations for that information.
4. General: Please provide a Special Inspections Certificate with Parts A and B completed. Please add high strength bolting to the list.
5. General: Please provide written responses to all review comments.
11/09/2020 SBLOOD1 ENGINEERING REVIEW Reqs Change DP needs to be approved before building plans can be approved.

Stephen Blood
stephen.blood@tucsonaz.gov
11/09/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
11/12/2020 IMONSHI1 OUT TO CUSTOMER Completed