Permit Number: T20CM06779
Parcel: 11702094C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM06779
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/07/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change The replacement faucets for the lavatories shall be metering faucets that dispense a maximum of 0.25 gallons per metering cycle but the faucet cycle must last at least 10-seconds for accessibility. The specified American Standard faucets are factory-set for a 7.5-second dispensing cycle. Reference: Section 412.11, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
10/07/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
10/07/2020 ROBERT SHERRY WATER REVIEW Completed
10/08/2020 JPEELDA1 FIRE REVIEW Approved
10/12/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Provide complete electrical plans for the proposed electrical work.
2. Designing the site Electrical constitutes the practice of engineering. Provide plans sealed by an Arizona Registrant. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304
Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements.
10/15/2020 SSHIELD1 ENGINEERING REVIEW Passed
10/15/2020 STEVE SHIELDS ZONING REVIEW Approv-Cond
10/29/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet CS1; Project Scope; Code Analysis: The Code Analysis indicates the actual building area of 5666 SF, while the Project Scope indicates 3600 SF. Please coordinate.
2. Sheet CS1; Code Analysis (Plumbing Fixtures): The required water closets should indicate i per 25 for the first 50 for each sex, for a total of 2 required. Please revise.
3. Sheet CS1; Code Analysis (Plumbing Fixtures): The table indicates 6 water closets and 6 lavatories provided. The floor plans do not indicate that. Please verify.
4. Sheet A4; Elevation 3: Please provide the length of the vertical grab bar per the ICC/ANSI Figure 604.5.1.
5. Sheet A4; Elevation 17: Please indicate the horizontal grab bar has a minimum 36" length per the ICC/ANSI Figure 604.5.2.
6. General: Please provide a project valuation.
7. General: Please provide written responses to all review comments.
10/29/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed