Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM06772
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/18/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. The Description of work on the permit application states "Upgrade the building electric service". There is no information on the plans to support this.. Please provide detailed information for the scope of electrical work on the plans. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
11/18/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3.1.1, IMC 2018 2. Provide a design for the proposed kitchen exhaust system that clearly shows that the installation will comply with the requirements of Sections 302, 304, 506, 507, and 508, IMC 2018. Reference: Section 107.2.1, IBC 2018. 3. Show how the proposed termination of the Type I exhaust duct and exhaust fan complies with requirements of Sections 506.3.13.3 and 506.5.6, IMC 2018. 4. Provide structural calculations and details to show that the Type I hood is supported from the building structure in accordance with Section 507.2.4, IMC 2018 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2018. 5. Provide adequate make up air for the kitchen exhaust hood. Reference: Section 508.1 IMC 2018. |
11/18/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify the available gas service pressure; Southwest Gas generally will provide service only at 7" WC, 2 PSIG, or 5PSIG. 2. The proposed appliances will the installation of pressure regulators. Specify the type of regulator, the pressure range settings, and the location of the regulators. If the specified gas pressure regulators are being installed indoors, verify if they are equipped with and labeled for use with a vent-limiting device or show how the regulators are to be safely vented. Reference: Section 410.3, IFGC 2018. 3. Provide an automatic fuel shut off valve for the Type I hood, interlocked with the hood fire extinguishing system. Reference: Section 904.3.3, IBC 2018. 4. Clarify the scope of work shown in the plumbing plan. Reference: Section 107.2.1, IBC 2018. |
11/18/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
11/19/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Section Manager PROJECT: T20CM06772 3775 E 34th St Electrical Upgrade. TRANSMITTAL DATE: November 19, 2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. Zoning cannot approve the building plans until all other PDSD review agencies have approved. 2. Demonstrate how the requirements of Unified Development Code Article 4.9.9.E.2.l & .m are met. 3. The drawings shall be submitted as a single multi-page PDF file. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised drawings |
11/19/2020 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
11/19/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A-1r; IBC Review Note: A reference is made to the 2012 IBC. Please revise that reference. 2. Sheet A-1r; Framing Plan @ Hood: Please indicate how the new hood is supported. Provide structural calculations as required. 3. Sheet A-1r; Framing Plan @ Hood; Brace Wall Detail: The Framing Plan indicates 2-2x10 beam supporting the new 2x8 framing, while the Wall Detail indicates 2-2x12. Please coordinate. 4. General: Please clarify the Scope of Work. 5. General: Please provide written responses to all review comments. |
11/19/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
12/02/2020 | ARUIZ1 | FIRE | REVIEW | Passed |