Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T20CM06702
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/23/2020 | MALLORY RESS | ZONING | REVIEW | Approved | |
| 10/23/2020 | DTRAMME1 | ENGINEERING | REVIEW | Passed | |
| 10/23/2020 | ANDREW CONNOR | NPPO | REVIEW | Reqs Change | e site is within the following overlay zone: 5.2. HILLSIDE DEVELOPMENT ZONE (HDZ) Add the following notes to cover sheet: Vegetation Retention and Revegetation a. Vegetation Retention (1) Existing viable and transplantable trees with four inch or greater trunk diameter and cacti shall be preserved in their original locations, except for building sites and access and utilities serving building sites. (2) When retention of the above trees and cacti in their original locations is not possible due to building site location, the trees and cacti shall be salvaged and replanted in areas requiring revegetation, whenever possible. b. Revegetation All cut or fill slopes that are no steeper than three horizontal to one vertical and all utility trenches or septic leaching fields that are not located in parking or driveway areas shall be revegetated in compliance with the following standards: (1) All plants used in revegetation shall be the same as the native vegetation on the site prior to grading or clearing or any adjacent site; and, (2) Revegetation shall be accomplished with the following minimum standards for plants: (a) Desert trees, a minimum of 15-gallon size with a minimum trunk diameter of two inches measured at the soil level, or large specimen cactus shall be placed at the same vegetation density found on the site prior to any clearing, grubbing, or grading; and, (b) Seeds for trees, desert shrubs, and grasses shall be planted with a density adequate to control erosion and may use one of the following methods of planting: Raked into the soil with appropriate mulch materials; hydroseeding; anchored mulches; or established on jute, rolled straw, or similar material. Another method may be approved by PDSD. (3) A temporary watering system shall be installed until the revegetation materials are established. 3. Slope Stabilization All slopes steeper than a ratio of three horizontal to one vertical, with the exception of retaining walls, shall be stabilized with properly engineered stone riprapping or sculptured rock as follows: a. Stone riprapping shall be hand-placed on the slope; b. The stabilizing material used shall blend with the natural appearance of the site or lot and the surrounding terrain; and, c. Vegetation retention and revegetation should be used in conjunction with riprapping. |
| 10/23/2020 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T20CM06702 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL COMMENTS: 1. All SFR and Duplex plans submitted after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 . a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces. b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. 2. All construction drawings submitted after June 1, 2010 for one- or two-family dwellings must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one story dwelling. Additional gray fixture drains are optional. Show a second clothes washer standpipe plumbed to an exterior wall above grade when feasible, or a bathing fixture drain looped 3’ beyond an exterior wall below grade before connection to the building drain. See details at https://www.tucsonaz.gov/files/pdsd/codes-ordinances/Grey_Water_Options_FINAL_.pdf FLOOR PLANS: 1. Show a maximum ½” floor elevation change at a notated accessible route entrance on the floor plan, R106.1.1. Include all threshold conditions for a route from the exterior into the living space. 2. Show the garage floor direction of slope, R309.1. SECTIONS - DETAILS: 1. In the attic spaces provide a calculation for showing the attic ventilation opening size using 1 to 150 of attic area in compliance with R806.2. Provide appropriate upper and lower space vents when applying the reduced area calculation. OUTDOOR LIGHTING CODE 1. Adjustable fixtures are considered unshielded because the lamp is not fixed in a fully shielded position. Full cut-off fixtures are non-adjustable with no light above the horizontal plane (fixtures are completely closed above and to the lowest point of the lamp). Update the calculation for the unshielded fixture type. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. If you have any questions, please contact: Ken Van Karsen (520) 791-5550 City of Tucson Residential Plan Review |
| 10/26/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | This residence will have a “fire-flow calculation area”(2018 IFC Appendix B, Section B102 and 105.1) greater than 3,600 sq. ft.: therefore this house will require a residential sprinkler system unless the fire flow in the nearest hydrant is met. Additionally, the hydrant must be within 600’ of all parts of the residence. Contact Tucson Water engineering (Fred.Coy@Tucsonaz.gov) for a hydraulic analysis. Provide notes on plan regarding verification of fire flow and proximity of hydrant or intent to install a fire sprinkler system. If a system will be installed, residential or quick response sprinklers shall be used. The sprinkler system may be connected to the domestic water supply, provided the required design density can be met. Be advised that Tucson Water will not allow a residential sprinkler system to be supplied by a 5/8" meter. A minimum of ¾” meter will be required by Tucson Water. Residential fire sprinkler system shall be installed in accordance with the 2018 IFC and NFPA 13D. |