Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T20CM06687
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/06/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | PREVIOUS COMMENTS: 1. Sheet 2G01.02; Plan Review Data: The Project Information indicates 46,700 SF Medical Office Building, while the Building Design Data indicates 46,760 SF. Please coordinate. 2. Sheet 2A06.20; Section 1: Should the canopy beam be located in the space between the masonry walls? Please verify. 3. Sheet 2A06.20; Section 2: This section appears to depict the steel column extending past the beam bottom flange. Please clarify and revise. 4. General: Please provide a site plan in the drawings. 5. General: Please provide north arrows on Sheets 2G02.01, 2G02.02, 2A01.01, 2A01.02, 2A01.03, 2A01.11, 2A01.12, 2A02.01, 2A11.01, 2A11.02, 2ID01.01, 2ID01.02, 2ID02.01, and 2ID02.02. 6. General: Please remove all references to the 2012 IBC. 7. General: Please provide written responses to all review comments. SECOND REVIEW COMMENTS: 1. General: It is not clear that all previous comments were addressed on the drawings as requested, and there were no responses to the Building comments. Please address all comments from the first review and respond how you revised the drawings. 2. General: Were all sheets included in this submittal that were part of the first submittal? In the next submittal, please include all sheets that were revised, along with all sheets that had no revisions. We must receive a somplete set of drawings for the third review. |
01/06/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Per the previous electrical plan review comments and response; # 2. It was requested to provide full compliance with the 2012 Tucson/Pima County Outdoor Lighting Code, (OLC). Per note GENERAL NOTE 'G' on plan sheet 2E00.11, states that,"EXISTING BUILDING AND POLE LIGHTS ARE NOT INCLUDED IN THESE TOTAL LUMEN CALCULATIONS". As per section 104.2.1(2) of the OLC. "The total of full cut-off and unshielded lumens for the parcel" must be accounted for to verify lumen cap totals do not exceed the lumen cap per acre as shown per table 401.1 of the Code. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. 2012 Tucson/Pima County Outdoor Lighting Code, (OLC). |
01/14/2021 | ELISA HAMBLIN | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Elisa Hamblin, AICP; Principal Planner; Zoning Review PROJECT: New Medical Office T20CM06687 – Related DP19-0164 Building Plan (2nd Review) TRANSMITTAL DATE: January 14, 2021 1. Zoning has reviewed the building plans for compliance with the development package DP19-0164. While the building plans are consistent with the DP as it relates to the zoning review purview of the building footprint, building height, square footage, site conditions etc., zoning cannot approve the building plans until all PDSD Commercial Plans reviewers have approved the building plans. If you have any questions about this transmittal, please contact me at Elisa.Hamblin@tucsonaz.gov |
12/10/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | The cavity and continuous insulation entries for the envelope assemblies are for the R-value of the insulation only. COMcheck calculates a U-value for each wall or roof assembly without insulation based on the description of the assembly. Verify that the COMcheck entries for the continuous insulation are for the insulation only. [Initial comment: Demonstrate energy code compliance for the building envelope using calculations based on the current code. Reference: Sections C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2018.] |
12/10/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. An approved development plan is not to be used for construction. Provide a site plan showing the location of the proposed building, existing structures on the site, distances to the lot lines and the established street grades as part of the shell drawing package. Reference: Sections 104.2 and 107.2.1, IBC 2018. [Initial comment: Provide a site plan showing the location of the proposed building, existing structures on the site, distances to the lot lines and the established street grades. Reference: Section 107.2.6, IBC 2018.] 2. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide a site plan showing the installation of the water service to the building and the installation of the building sewer as part of the shell drawing package. Reference: Sections 104.2 and 107.2.1, IBC 2018. [Initial comment: Provide a site drawing showing the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.6, IBC 2018.] 3. Provide dimensions and installation information for the indicated roof scuppers. Provide structural calculations to show that the specified roof scuppers are adequate to protect the roof from the rain load. Reference: Sections 1101.7, 1106.1, 1106.4 and 1106.5, IPC 2018; Sections 1502.2 and 1502.3, IBC 2018. [Initial comment: Provide secondary (overflow) roof drainage. Reference: Sections 1108.1, 1108.2 and 1108.3, IPC 2018.] |
12/10/2020 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building). Provide a site plan showing the installation of the water service to the building as part of the shell drawing package. Reference: Sections 104.2 and 107.2.1, IBC 2018. [Initial comment: Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2018.] |
12/17/2020 | JVINCEN1 | FIRE | REVIEW | Approved | |
12/28/2020 | SBLOOD1 | ENGINEERING | REVIEW | Approved |