Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T20CM06687
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/12/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Demonstrate energy code compliance for the building envelope using calculations based on the current code. Reference: Sections C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2018. 2. Show how one of the "Additional Efficiency Package Options" (C406, IECC 2018) is to be accomplished. Reference: Section C401.2, IECC 2018. 3. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C403.3.1, IECC 2018. 4. Show the size, routing, and termination of the condensate drains. Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or below grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson. 5. Verify that the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). The exhausted air from the restrooms shall be limited to no more than 10% of any subsequent supply air stream. Reference: Section 403.2.1 (4), IMC 2018. 6. Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3.1.1, IMC 2018. |
10/12/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a site plan showing the location of the proposed building, existing structures on the site, distances to the lot lines and the established street grades. Reference: Section 107.2.6, IBC 2018. 2. Provide a site drawing showing the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.6, IBC 2018. 3. Provide secondary (overflow) roof drainage. Reference: Sections 1108.1, 1108.2 and 1108.3, IPC 2018. |
10/12/2020 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2018. |
10/14/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide GFI protection for the electrical service main breaker as required per NEC 230.95. 2. Provide complete compliance with the 2012 Tucson/Pima County Outdoor Lighting Code. See section 104 for plan submittal requirements. This Code can be printed or downloaded from www.tucsonaz.gov. 3. Provide complete compliance with the 2018 IECC for the lighting. Do not confuse this with the Outdoor Lighting Code. 4. The electrical service line diagram shows a panel identified as 'IDLB' please clarify. 5. Provide a note on the power plans requiring compliance with NEC art 517.13 where applicable for wiring methods. 6. Provide elevator pit or equipment room details for power and lighting that complies with NEC art 620 part 3. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. 2012 Tucson/Pima County Outdoor Lighting Code. |
10/15/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: New Medical Office T20CM06687 – Related DP19-0164 Building Plan (1st Review) TRANSMITTAL DATE: October 15, 2020 1. Zoning has reviewed the building plans for compliance with the submitted development package DP19-0164. While the building plans are consistent with the DP as it relates to the zoning review purview of the building footprint, building height, square footage, site conditions etc., zoning cannot approve the building plans until the DP revision has been approved and all PDSD Commercial Plans reviewers have approved the building plans. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
10/22/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Page 2G 01.02 notes that the Authority Having Jurisdiction is the State FM please change to reflect the Tucson Fire Department or add us as additional Page 2G 01.02 has a note regarding the fire alarm that needs to be changed to 907.2.2 Please add a note that the fire sprinkler, fire alarm and underground permit are a deferred submittal to TFD Please add a note that the building will need to be tested for Emergency Responder Radio Coverage prior to final and test results provided to TFD |
11/02/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet 2G01.02; Plan Review Data: The Project Information indicates 46,700 SF Medical Office Building, while the Building Design Data indicates 46,760 SF. Please coordinate. 2. Sheet 2A06.20; Section 1: Should the canopy beam be located in the space between the masonry walls? Please verify. 3. Sheet 2A06.20; Section 2: This section appears to depict the steel column extending past the beam bottom flange. Please clarify and revise. 4. General: Please provide a site plan in the drawings. 5. General: Please provide north arrows on Sheets 2G02.01, 2G02.02, 2A01.01, 2A01.02, 2A01.03, 2A01.11, 2A01.12, 2A02.01, 2A11.01, 2A11.02, 2ID01.01, 2ID01.02, 2ID02.01, and 2ID02.02. 6. General: Please remove all references to the 2012 IBC. 7. General: Please provide written responses to all review comments. |
11/02/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/09/2020 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | The DP needs to be approved before the building permit can be approved. Stephen Blood Stephen.blood@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/10/2020 | IMONSHI1 | OUT TO CUSTOMER | Completed |