Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM06684
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/05/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 10/07/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify keynote 8 on sheet P1; it calls for a ½" MP up to the ceiling but the schematic shows a ¾" MP at that location. 2. Verify the connected load for the four appliances under the hood. The load on detail A/P1, the schedule on sheet A3, and the manufacturer's literature show different loads. |
| 10/07/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide guards for equipment located within 10 feet of a roof edge or of a walking surface that is elevated more than 30 inches above the adjoining grade. Reference: Section 304.11, IMC 2018. 2. Verify the listed exhaust flow rate for the hood for the proposed appliances. The code minimum exhaust flow rate for a wall canopy with heavy-duty appliances is 400 CFM/foot, twice what this hood is drawing. Reference: Sections 507.5 and 507.5.2, IMC 2018. |
| 10/07/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 10/14/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 10/15/2020 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 10/15/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 10/15/2020 | DAN SANTA CRUZ | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A4: The stamp/signature/date of the registered design professional is required on this sheet. |
| 11/03/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |