Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T20CM06395
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/23/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 03/23/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The civil plan has been included with the building permit plan set but the plumbing and civil designs are not coordinated. [Second comment: Comment not addressed. The civil plan shall be included in the building plan set; an approved development package is not to be used to construct utilities to a building.] [Initial comment: Coordinate the arrangement of the sanitary and grease waste building drains with the building sewer shown on the civil utility plan. Reference: Section 107.2.1, IBC 2018.] 2. A Chicago 802-VE2805XKCP faucet is a polished chrome lavatory faucet with 4” centers, Quaturn cartridges, and lever handles. It is not a metering faucet. [Second comment: Comment not addressed.] [Initial comment: Provide a metering faucet for the restroom lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.] 3. Neither the civil utility plan nor the plumbing plan include the rim elevation of the next upstream manhole. The plumbing plan shows an installation detail for a backwater valve but no location for the backwater valve is shown on the plumbing valve. The civil plan shows two backwater valves but does not protect the grease interceptor. [Second comment: Comment not addressed.] [Initial comment: Provide the rim elevation of the next upstream sanitary manhole. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.] |
| 04/06/2021 | EHAMBLI1 | ENGINEERING | REVIEW | Approved | |
| 04/06/2021 | EHAMBLI1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 04/06/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved |