Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T20CM06395
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/04/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Initial comment: Show that the walk-in cooler meets the construction requirements of Section C403.10.2, IECC 2018.] 2. Comment not addressed. [Initial comment: Show that the walk-in cooler meets the efficiency requirements of Section C403.10.2.1, IECC 2018.] 3. Comment not addressed. [Initial comment: Provide general room exhaust for any cooking appliance that does not require the installation of a Type II hood (e.g. microwave combi oven, panini press, rethermalizer, etc.). The minimum exhaust rate shall be 0.70 CFM per square foot, using a minimum area of 100 square feet for each individual appliance. Reference: Section 507.1, exception 2 and 507.3, IMC 2018.] |
| 02/04/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. The civil plan shall be included in the building plan set; an approved development package is not to be used to construct utilities to a building. [Initial comment: Coordinate the arrangement of the sanitary and grease waste building drains with the building sewer shown on the civil utility plan. Reference: Section 107.2.1, IBC 2018.] 2. Comment not addressed. [Initial comment: Provide a metering faucet for the restroom lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.] 3. Comment not addressed. [Initial comment: Provide the rim elevation of the next upstream sanitary manhole. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.] |
| 02/11/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Salad and Go T20CM06395 Building Plan (2nd Review) TRANSMITTAL DATE: February 11, 2021 1. Zoning has reviewed the building plans for compliance with development package DP20-0184. While the building plans are consistent with the DP as it relates to the zoning review purview of the building footprint, building height, square footage, site conditions etc., zoning cannot approve the building plans until the DP is approved and all PDSD Commercial Plans reviewers have approved the building plans. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin @tucsonaz.gov or (520) 837-4966 |
| 02/17/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 02/17/2021 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 03/11/2021 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | The DP needs to be approved before the building plans. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |