| 01/07/2021 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 01/07/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 01/07/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Please resubmit updated drawings along with a detailed comment response letter, which states how all zoning review comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the unapproved development package (DP20-0183) and found that the building plans are consistent with the unapproved development package as it relates to the zoning requirements, which includes the building square footage, building height, building footprint, and location on the site. 2. COMMENT: Zoning will review the building plans on the next submittal to assure that any updates made to the building plans or the development package does not affect zoning requirements. 3. COMMENT: Zoning cannot approve the building plans until all PDSD commercial plans reviewers have also approved the building plans. If you have any questions about this transmittal, Contact Elisa Hamlin at Elisa.Hamlin @tucsonaz.gov. |
| 12/14/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 12/14/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Comment not addressed. [Initial comment: The minimum energy efficiency requirements for the split-system (CU/FC-1 and CU/FC-2) and single package (HP-1 and HP-2) heat pumps are shown in Table C403.3.2 (2). Correct the cooling capacity shown for HP-2, 5434 kBtu/h is equal to 5,434,000 BTUH.] |
| 12/23/2020 | SBLOOD1 | ENGINEERING | REVIEW | Approved |