Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM06280
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/15/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | No plans to review |
09/25/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
09/25/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
09/25/2020 | ROBERT SHERRY | WATER | REVIEW | Passed | |
10/06/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide complete compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the exterior lighting. 2. Designate a branch circuit and panel, conduit and wire sizing and types, switching controls, and verify the panel has sufficient capacity for the increased load and circuit breaker space. 3. Show conduit routing on the plans. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
10/09/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: Complete Landscaping Shade Structure Addition 2472 N Flowing Wells T20CM06280 (1st Review) TRANSMITTAL DATE: October 9, 2020 1. Zoning has reviewed the building plans for compliance with the an approved development package (DP) but was unable to find an approved DP showing this shade structure. Zoning will not be able to approve this plan until a DP is submitted and approved. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
10/21/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
10/21/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/27/2020 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | Before plans can be approved a DP will need to be reviewed and approved. Stephen Blood stephen.blood@tucsonaz.gov |