Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM06229
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/16/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 09/23/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Verify the gross area of the building and recalculate the plumbing fixture requirements. Reference: Section 2902.1, IBC 2018. |
| 09/23/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Your drawings in T13CM03898 labeled the area being modified as a warehouse. In activity T14CM07684, your drawings call the same area an existing open office. In what activity was the area converted from a warehouse to an office? When was the area conditioned? Reference: Section 107.2.1, IBC 2018 and Section C503.2, IECC 2018. 2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018. |
| 09/25/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 09/30/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Verify that there is a 120v GFI receptacle on the roof within 25' of mechanical equipment. If not, provide as required per NEC 210.63 Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
| 10/05/2020 | SAMUEL ROGERS | ZONING | REVIEW | Approved | |
| 10/19/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. General: Although the Occupancy Classification remains the same (Office-B), it appears the Occupant Load has increased. Changing an open office space to an open multi-purpose space has increased the Occupant Load to 93. Please revise the plumbing fixture calculations, and revise the drawings as required. 2. General: Please provide written responses to all review comments. |
| 10/19/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 10/27/2020 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | FUP required, sent out application |