Permit Number: T20CM06229
Parcel: 11204375A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM06229
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/16/2020 JPEELDA1 FIRE REVIEW Approved
09/23/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Verify the gross area of the building and recalculate the plumbing fixture requirements. Reference: Section 2902.1, IBC 2018.
09/23/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Your drawings in T13CM03898 labeled the area being modified as a warehouse. In activity T14CM07684, your drawings call the same area an existing open office. In what activity was the area converted from a warehouse to an office? When was the area conditioned? Reference: Section 107.2.1, IBC 2018 and Section C503.2, IECC 2018.
2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018.
09/25/2020 ROBERT SHERRY WATER REVIEW Completed
09/30/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Verify that there is a 120v GFI receptacle on the roof within 25' of mechanical equipment. If not, provide as required per NEC 210.63

Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements.
10/05/2020 SAMUEL ROGERS ZONING REVIEW Approved
10/19/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. General: Although the Occupancy Classification remains the same (Office-B), it appears the Occupant Load has increased. Changing an open office space to an open multi-purpose space has increased the Occupant Load to 93. Please revise the plumbing fixture calculations, and revise the drawings as required.
2. General: Please provide written responses to all review comments.
10/19/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
10/27/2020 SBLOOD1 ENGINEERING REVIEW Reqs Change FUP required, sent out application