Permit Number: T20CM05744
Parcel: 133369540

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM05744
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/01/2020 STEVE SHIELDS ZONING REVIEW Approved
09/01/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide mechanical ventilation for the apartments. Reference: Sections R403.5.4 and R503.1.2, IECC 2018.
2. Verify that the size (i.e. cooling capacity) of the replacement air conditioning equipment is based on the building loads calculated using ACCA Manual J or another approved program. Reference: Sections R403.7 and R503.1.2, IECC 2018.
09/01/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. The electrical plans submitted were sealed and signed by the Electrical Registrant in the year 1997. The scope of electrical work includes branch circuit re-wiring and device/lighting, breaker panel replacements of unit 1101 and device/lighting replacement of unit 1201. Provide updated plans sealed by a current Electrical Engineer. Show all changes, and code compliance with the 2017 NEC, and 2012 Tucson/Pima County Outdoor Lighting Code for any alterations to the exterior lighting.
(a) Per the currently adopted 2017 NEC, replacement of the receptacles must be Tamper Resistant or Arc Fault protected as specified per the 2017 NEC art 406.4 and 406.12.
(b) Any re-wiring of branch circuits must meet the requirements for Arc Fault Protection as specified per 2017 NEC art.210.12D.

Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements, 2012 Tucson/Pima County Outdoor Lighting Code.
09/01/2020 SSHIELD1 ENGINEERING REVIEW Passed
09/01/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
09/01/2020 ROBERT SHERRY WATER REVIEW Passed
09/01/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
09/01/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/02/2020 JPEELDA1 FIRE REVIEW Approved