Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T20CM05701
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/06/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. Ref; Plan Sheet EA 7.0. The line diagram for the 480 volt electrical service shows new feeders from an existing 200 amp disconnect to a new Wash Machine. Indicate fuse, conduit, conductor sizes and types. Also show the locations of this equipment on the electrical floor plans. Ref; 2018 IBC sec 107.2.1, 2017 NEC, City of Tucson Commercial Permit/Plan Submittal Requirements. |
| 05/06/2021 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the size and serial number of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. |
| 05/06/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Demonstrate energy code compliance for the alteration to the building envelope using calculations based on the current code. Reference: Sections C503.1 and C503.3, International Energy Conservation Code 2018. |
| 05/06/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The use of a point-of-use water dispenser in lieu of a drinking fountain requires the installation of a listed and labeled dispenser along with a permanently mounted disposable cup dispenser. The cup dispenser shall be located adjacent to the water dispenser with the dispensing end between 34” and 48” above the finished floor. |
| 05/10/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved |