Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T20CM05335
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/07/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T20CM05335 3156 E Terra Alta Work Room Addition Residential (3rd Review) TRANSMITTAL DATE: February 4, 2021 This site is located in the R-2 zone (UDC 4.7.9). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.5 - 9. COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1). Perimeter yard setbacks are based on a measurement from design grade to the highest point of the wall, see Unified Development Code (UDC) Article 6.4.5.b & Figure 6.4.5-A. The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A). 1. Based on a wall height of 12’-9” the required perimeter yard setback from the work room addition to the west property line is 8’-6”, proposed setback is 5’-6”. DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. A DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov. The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A). 2. Based on a wall height of 9’-0” the required perimeter yard setback form the ramada to the south property line is 6’-0”, proposed setback is 0’-0”. Based on a Zoning Administrator determination a Design Development Option (DDO) may not be used to reduce a perimeter yard setback to less than 1’-0”. That said a DDO will not work to reduce the perimeter yard setback for the existing ramada show along the south property line. The recommendation would be to request a neighbor signoff from the owner of the property at 3155 E 5th St. The following text would need to be provided on the site plan: My Name is____________________ and I am the owner of the property located at_______________________. I have reviewed the site plan and I have no objection to structure being located or constructed________ feet from the property line as depicted on the site plan. Signature: _____________________________ Date: _________________________________ If you are unable to secure the neighbor signoff you have two options 1) demonstrate on the site plan that the posts supporting the ramada are at least 1’-0” from the south property line with no more than a 2’-0” roof overhang and include this in the DDO or 2) if the post supporting the ramada are less than 1’-0” from the south property line you can apply for a Board of Adjustment for Variance for both the west and south setbacks. Board of Adjustment application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/codes/Zoning_Administration_Application_BA_fillable.pdf If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |