Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM05330
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/19/2020 | JGARCIA1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
08/19/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
08/19/2020 | PIMA COUNTY | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet G001; Plumbing Calculations: Per the IBC Table 2902.1, the plumbing fixtures indicated on this sheet are not adequate for the 208 occupant load. For 104 males, 4 water closets would be required (1 per 25 for first 50 = 2; 1 per 50 for remainder = 2). The same would be required for females. For 104 males, 3 lavatories would be required (1 per 40 for first 80 = 2; 1 per 80 for remainder = 1). The same would be required for females. Drinking fountains would require 3 (1 per 100 = 3). Please revise. 2. Sheet G001; Egress Plan: The three exits indicate a combined actual occupant load of 133 (84 + 42 + 7), while the actual occupant load is 208. Please revise the plan. 3. Sheets G011, G012, and G013: These sheets reflect the requirements and references of the ADAAG rather than the 2009 ICC/ANSI A117.1. Please revise. 4. Sheet A111; Floor Plan: There are many interior partitions that do not have a Wall Tag. Please provide. 5. Sheet A111; Sheet General Notes: Please add a note to reference Sheet A010 for Partition Types and Details. 6. Sheet A401; Typical Bathroom Mounting Heights: Please add a rear wall elevation indicating the location of the horizontal grab bar per the ICC/ANSI Figure 604.5.2. 7. General: Please provide written responses to all review comments. |
08/19/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
08/21/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
08/26/2020 | PIMA COUNTY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | MECHANICAL – COMMERCIAL Reviewer: Chris Anderson 1. Please respond to all review comments in writing. 2. Reference to and written requirements for mandatory performance of certain elements of the mechanical systems showing compliance with the 2018 International Energy Conservation Code do not appear to be included in the Mechanical Specifications on sheet M001 or elsewhere in the mechanical sheets. Please update the Specifications on sheet M001 and/or provide specifications elsewhere in the drawings tailored to Section C403.1 through C403.11, as applicable, of the 2018 IECC. For example, a. Add IECC 2018 to the Code list in item 2 and 3 of Part One – General on Specifications sheet M001. b. The Automatic Temperature Controls on Specification sheet M001 makes no mention of IECC mandatory requirements for deadband, off-hour controls, thermostatic setback, automatic start, etc. Please go through 2018 IECC Section C403.4 and add notation for mandatory controls. 3. The Mechanical Compliance Certificate (COMcheck) on sheet M002 is per the 2012 IECC. The City of Tucson adopted the 2018 IECC in January 2019. Please revise the COMcheck for current Code and required efficiencies. Ref. 21018 IECC C403.3. 4. Submit heating and cooling load calculations summary sheets to justify the capacities of the heating and cooling units shown in the Packaged Rooftop Unit Schedule on sheet M002. Per 2018 IECC C403.3.1 the output capacity of heating and cooling equipment shall be not greater than that of the smallest available equipment size that exceeds the loads calculated in accordance with Section C403.1.1. |
08/26/2020 | PIMA COUNTY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/26/2020 | JGARCIA1 | WATER | REVIEW | Approved | |
08/26/2020 | PIMA COUNTY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | PLUMBING – COMMERCIAL Reviewer: Chris Anderson 1. Please respond to all review comments in writing. 2. Please confirm whether or not a backwater valve is required in the new building drain. Per City of Tucson amendment to the 2018 IPC 714.1, “where the finished floor is less than 12-inches above the elevation of the next upstream manhole cover in the sewer, a backwater valve shall be installed..” 3. Please confirm that the faucet for lavatories L-1 dispense no more than .25 gallon per metering cycle. Ref. City of Tucson amendment to the 2018 IPC 419.6. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/26/2020 | JGARCIA1 | APPROVAL SHELF | Completed |
08/26/2020 | JGARCIA1 | OUT TO CUSTOMER | Completed |
08/26/2020 | JGARCIA1 | REJECT SHELF | Completed |