Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T20CM05084
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/27/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 09/29/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Comment not resolved. The code requires a scupper with a width equal to the circumference of the required roof drain AND a minimum height of 4-inches. A 6.5-inch diameter circular scupper does not have the same flow capacity of a 6.5-inch by 4-inch rectangular scupper. Show the primary and secondary scuppers on the elevation drawings. [Second comment: The roof drainage calculations are incorrect: you have no horizontal gutters so Table 1106.6, IPC 2018 is not appropriate. Based on the areas of the flat roof sections of the building and using Table 1106.2, IPC 2018, a 2" roof drain would be required. Section 1106.5, IPC 2018 specifies that a scupper is to have a width equal to the circumference of the required roof drain, 6.28" in this case. The secondary scupper must be the same size as the primary scupper (Section 1108.3, IPC 2018).] [Initial comment: Provide secondary (overflow) roof drainage for the four flat roof areas of the garage. Reference: Sections 1106.5, 1108.1, 1108.2 and 1108.3, IPC 2018.] |
| 10/12/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments and provide a written response. Per the previous comment. The Outdoor Lighting Calculations need to be in full compliance with the OLC Code. Please provide the follwing information on the plan. Provide evidence on the plans that the proposed exterior lighting fully complies with the Outdoor Lighting Code. See section 104 for plan submittal requirements. Provide a complete luminaire schedule that identifies the luminaire with a mark that correlates with the luminaires on the lighting plan. Verify quantities are accurate. Provide a lighting site plan showing the locations and types of all exterior luminaires including existing. Indicate light source color temperature per section 402.1 requirements, not to exceed 3500K. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. Specify any exceptions used. Curfew lighting control requirements If applicable. Ref; Electrical line diagram. (A) Aluminum conductor not allowed as a GEC, per NEC 250.64A. (B) A 3 phase electrical service requires 4 conductors for the sevice Lateral, 3- Ungrounded and 1 Neutral. (C) A main service disconnect ahead of the service panel ‘A’ or a main circuit breaker in the panel is required. NEC 230.71. REF; 2018 IBC 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements , Tucson/Pima County Outdoor Lighting Code. (OLC) |