Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T20CM05084
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/26/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The roof drainage calculations are incorrect: you have no horizontal gutters so Table 1106.6, IPC 2018 is not appropriate. Based on the areas of the flat roof sections of the building and using Table 1106.2, IPC 2018, a 2” roof drain would be required. Section 1106.5, IPC 2018 specifies that a scupper is to have a width equal to the circumference of the required roof drain, 6.28” in this case. The secondary scupper must be the same size as the primary scupper (Section 1108.3, IPC 2018). [Initial comment: Provide secondary (overflow) roof drainage for the four flat roof areas of the garage. Reference: Sections 1106.5, 1108.1, 1108.2 and 1108.3, IPC 2018.] |
| 04/29/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Previous Comment; Sheet A2: Sections 2 and 3 indicate a 16" minimum depth to the bottom of the foundation, while the soil report indicates a minimum depth of 1'-6". Please revise. 2. Sheet 2 of 5; Site Plan: Are there three new storage/garage buildings (Keynote 10), or two? Please verify. 3. General: Please provide written responses to all review comments. |
| 05/11/2021 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 05/11/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 05/11/2021 | SSHIELD1 | ZONING HC | REVIEW | Passed | |
| 05/26/2021 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
| 06/02/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. Ref; Plan A1. This was the only plan found in the 2nd plan set with limited electrical information for the Garages and Gates. Please provide the following information for clarity. Ref; ELCTRICAL NOTES. Revise the code references to 2017 NEC and 2018 IECC. Provide compliance with the 2018 IECC for the lighting. Provide compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the exterior lighting. Identify Panel A on the electrical floor plan. Ref; Panel Schedule. Provide a complete electrical line diagram that includes panel A. Also 27,800 is not a NEMA Standard AIC Rating for electrical equipment. Please provide the correct rating for the equipment. Balance the load between phases for panel A. There is no load on C phase. Is Branch circuit #4 Panel A for both Gate Operators? Is this plan typical for both Garages? If not provide an electrical plan that clearly shows power and lighting for each garage. Verify disconnecting means are provided within site for the gate operators/motors. NEC 430. Provide for a Grounding Electrode System at the Garages. NEC 250.32. Ref; 2018 IBC 107.2.1, 2017 NEC, Tucson/Pima County Outdoor Lighting Code. City of Tucson Commercial Plan Submittal Requirements. |