Permit Number - T20CM04919
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/03/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please provide load calcs to verify code compliance for the increased electrical load.
2018 IBC 107.2.1, 2017 NEC 220.
08/03/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Demonstrate energy code compliance for the building envelope using calculations based on the current code. Reference: Sections C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2018.
2. Alterations of an existing, non-conditioned building shall be brought into full compliance with the 2018 International Energy Conservation Code. Reference: Section C503.2, IECC 2018.
3. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C403.3.1, IECC 2018.
4. Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3.1.1, IMC 2018.
08/03/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide third-party listing and material standards for all plumbing fixtures being provided by others. Reference: Sections 303.4 and 402, IPC 2018.
2. Provide a metering faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
3. Show the water service to the building. Show the building shut off valve. Reference: Section107.2.1, IBC 2018.
4. Provide a detail showing how hot water is to be supplied to P-2, P-3, and P-4. Reference: Section107.2.1, IBC 2018.
5. Provide the rim elevation of the next upstream sanitary manhole and the first-floor elevation. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.
08/03/2020 ROBERT SHERRY WATER REVIEW Completed
08/04/2020 DTRAMME1 ENGINEERING REVIEW Passed
08/04/2020 JVINCEN1 FIRE REVIEW Approved
08/10/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
08/10/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A.1; Code Analysis: The Plumbing Requirements indicate 2 men's and 1 women's water closets are provided, 2 men's and 1 women's lavatories are provided, a drinking fountain (sink) is provided, and a service sink is provided. Please indicate on the Site Plan where these fixtures are located, as the new enclosed area indicates only one restroom. Verify the path of travel to these fixtures not in this new enclosed area meets the requirements of the IBC Sections 2902.3.3 and 2902.5.
2. Sheet A.1; Code Analysis: The drinking fountain indicates individual cups at a sink. A high/low drinking fountain or a single point of use water dispenser are required. Please verify.
3. Sheet A.1; Code Analysis: The analysis indicates 858 SF of new space with 17 occupants. How was the occupant load calculated?
4. Sheet S.1; Design Criteria: The first note indicates the 2018 International Residential Code. Please revise.
5. Sheet S.1; Loads: A note indicates this building is a Design Category I. Per the IBC Table 1604.5, this building would be included in the Risk Category II. Please verify.
6. Sheet S.1; Loads: The Seismic Design Category should be D. Please verify.
7. General: Please provide structural calculations for this project.
8. General: Please provide a Special Inspection Certificate with Parts A and B completed.
9. General: Please provide written responses to all review comments.
08/21/2020 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Section Manager

PROJECT: Zion Carwash
T20CM04919 - 1st Review)

TRANSMITTAL DATE: August 21, 2020

1. A Development Package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to this building plan set.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956