Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T20CM04413
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/28/2021 | STANTEC | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T20CM04413 REV1 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. GENERAL COMMENTS 1. The written narrative provided does not align with the plans provided. For example, there are 7 structural sheets noted in the narrative, but only 1 structural sheet was provided, and it wasn’t even in the narrative. Please coordinate. {This review was based only on the drawing sheets provided and the narrative was only occasionally referenced when it was deemed helpful.} ARCHITECTURAL COMMENTS There are no comments. STRUCTURAL COMMENTS Sheet 1s.102 1. There are two issues with this sheet: a. The sheet is marked “PRELIMINARY – NOT FOR CONSTRUCTION”. To be “permitted to construct” the sheet must be “for construction. b. This is a foundation sheet. In the approved set of plans this sheet was marked “REFERENCE DRAWING – PREVIOUSLY REIVEWED UNDER THE FOUNDATION, STRUCTTRUAL STEEL, AND MASONRY PERMIT SET T20CM02083. This sheet again needs to be so noted, and a revision to Permit T20CM02083 needs to be submitted separately. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/28/2021 | NGARCIA3 | OUT TO CUSTOMER | Completed |