| 07/22/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 08/04/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Passed | |
| 08/12/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 08/12/2020 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 09/15/2020 | PIMA COUNTY | BUILDING-COMMERCIAL | REVIEW | Reqs Change | PROJECT RETURNED FOR CORRECTIONS: Larry Chavez Larry.Chavez@Pima.gov General: 1) Provide roof framing plan for new roof/ceiling joists. 2) Provide detail for connecting new or "extended" joists to new beam. 3) Provide a complete design for squared off corner ceiling, roof and parapet, including finishes and insulation. 4) Provide a complete design for finish details for exterior roof, interior of parapet and exterior stucco. 5) Included insulation as required by 2018 IECC Sheet a2.0 1) New work results in a squared off corner. Provide roof framing plan showing proposed new steel columns, new beams showing how new corner is supported. Provide new details sufficient to show how existing or "extended" joists (keynote 214) are extended and supported by the new beam. 2) How are new beams installed and finished. Sheet a3.0 1) Existing reception area, show framing on framing plan Sheet a6.0 1) East Eleveation - Show and call out new corner above windows and how it is finished and a detail for how it is built. 2) East Elevation - Show how new beams are finished Sheet a9.0 1) Section 3 - Clarify if ceiling/roof joists are new or existing 2) Section 4 - Describe work at new squared off corner at ceiling. Note intentions regarding insulation and finishes for ceiling, roof and parapet. Structural Calculations: 1) Page 2 of 21 - Clarify which beam carries parapet wall above opening and cantilevered steel eyebrow. Is this M4? 2) Page 5 of 21 - Clarify point load of possible beam M4 as referenced above. Please respond to all comments in writing and submit with corrected drawings. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/15/2020 | JGARCIA1 | APPROVAL SHELF | Completed |
| 09/15/2020 | JGARCIA1 | OUT TO CUSTOMER | Completed |