Permit Number: T20CM04412
Parcel: 11704230A

Address:
180 E 5TH ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM04412
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/22/2020 JPEELDA1 FIRE REVIEW Approved
08/04/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Passed
08/12/2020 STEVE SHIELDS ZONING REVIEW Approved
08/12/2020 SSHIELD1 ENGINEERING REVIEW Passed
09/15/2020 PIMA COUNTY BUILDING-COMMERCIAL REVIEW Reqs Change PROJECT RETURNED FOR CORRECTIONS:
Larry Chavez
Larry.Chavez@Pima.gov

General:

1) Provide roof framing plan for new roof/ceiling joists.
2) Provide detail for connecting new or "extended" joists to new beam.
3) Provide a complete design for squared off corner ceiling, roof and parapet, including finishes and insulation.
4) Provide a complete design for finish details for exterior roof, interior of parapet and exterior stucco.
5) Included insulation as required by 2018 IECC

Sheet a2.0
1) New work results in a squared off corner. Provide roof framing plan showing proposed new steel columns, new beams showing how new corner is supported.
Provide new details sufficient to show how existing or "extended" joists (keynote 214) are extended and supported by the new beam.
2) How are new beams installed and finished.

Sheet a3.0
1) Existing reception area, show framing on framing plan

Sheet a6.0
1) East Eleveation - Show and call out new corner above windows and how it is finished and a detail for how it is built.
2) East Elevation - Show how new beams are finished

Sheet a9.0
1) Section 3 - Clarify if ceiling/roof joists are new or existing
2) Section 4 - Describe work at new squared off corner at ceiling. Note intentions regarding insulation and finishes for ceiling, roof and parapet.

Structural Calculations:
1) Page 2 of 21 - Clarify which beam carries parapet wall above opening and cantilevered steel eyebrow. Is this M4?
2) Page 5 of 21 - Clarify point load of possible beam M4 as referenced above.

Please respond to all comments in writing and submit with corrected drawings.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/15/2020 JGARCIA1 APPROVAL SHELF Completed
09/15/2020 JGARCIA1 OUT TO CUSTOMER Completed
09/15/2020 JGARCIA1 REJECT SHELF Completed