Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T20CM03946
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/17/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 08/17/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the number of drinking fountains that complies with the requirements of Sections 2902.1 and 2902.5, IBC 2018 and Section 410.3, IPC 2018. 2. Provide tempered water for the public restroom lavatory using an approved device conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2018. 3. Provide a metering faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 4. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. |
| 08/19/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 08/27/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1; Code Review (Plumbing Fixtures): Please provide the required drinking fountains in the Fixture Table per the IBC Table 2902.1 and Section 1109.5. 2. Sheet A1; Code Review (Width of Exits/Size of Doors): Both of these are indicated as N/A on this sheet. Doors shall meet the requirements of the IBC Sections1010.1 and 1022.2. Please revise. 3. Sheet A2; Floor Plan: Per the IBC Section 1017.3, the exit access travel distance shall be measured from the most remote point of each room or area along the natural and unobstructed path of horizontal and vertical (not diagonal) egress travel to an exit. Please revise the plan and Code Review section for the amended travel distance. 4. Previous Comment; General: Please provide a project valuation (labor + materials). This permit can not be completed without that value. 5. General: Please provide written responses to all review comments. |
| 09/03/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/04/2020 | VLEON1 | APPROVAL SHELF | Completed |
| 09/04/2020 | VLEON1 | OUT TO CUSTOMER | Completed |
| 09/04/2020 | VLEON1 | REJECT SHELF | Completed |