Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM03649
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/15/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
06/15/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC unit. Reference: Section C403.1.1 and C502.2.3, IECC 2018. 2. Secure the refrigerant circuit access ports of the condensing unit to prevent unauthorized access. Reference: Section 1101.10, IMC 2018 |
06/15/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/15/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/15/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1.0; Code Review (Occupancy Group): This sheet uses a factor of 500 SF/occupant. That is appropriate for a warehouse. Per the IBC Table 1004.5, this would fall under Agricultural Building, using a factor of 300 SF/occupant. Please revise. 2. Sheet A1.0; Code Review: Please revise the exiting requirements and plumbing calculations for the revise occupant load. 3. Sheet A1.0; Code Review (Exits): The number of exits is indicated as one. Per the IBC Table 1006.2.1, a Type F sprinklered building allows a maximum 100' common path of egress travel (to the exit). That distance is exceeded. Please verify. 4. Sheet A2.0; Floor Plan: Now that the double door at the south end of Corridor 103 is infilled, a dead end corridor has been created. Per the IBC Section 1020.4(2), the maximum length of that corridor is 50'. Please verify that is met for Corridor 103. 5. Sheet A2.0; Floor Plan: Please verify Corridor 107 meets the dead end travel distance per the IBC Section 1020.4(2). 6. Sheet A2.0; Section 4; Details 5 and 6: If these are handrails per the IBC Section 1014, please verify all requirements of that section are met. If these are guardrails, verify all requirements of the IBC Section 1015 are met. 7. General: Please provide written responses to all review comments. |
06/15/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
06/16/2020 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Passed | |
06/16/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
06/18/2020 | ALEXANDRA HINES | ZONING | REVIEW | Reqs Change | 1. Provide an odor mitigation plan demonstrating compliance with odor control requirements in resubmittal. UDC 4.9.9.E.2.m |