| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/16/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 06/19/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Show all of the pipe sizes on the sanitary isometric. Reference: Section 107.2.1, IBC 2018. 2. Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 3. Provide tempered water for the public restroom lavatories using approved devices conforming to ASSE 1070; the specified mixing valve is listed to ASSE 1017. Reference: Sections 416.5 and 607.1.2, IPC 2018. 4. Provide a watertight pan of galvanized steel, aluminum, or other approved material under the water heater with a drain to an approved location. Reference: Section 504.7, IPC 2018. 5. Provide cleanouts for all horizontal drains (e.g. the 3" horizontal drain downstream of the clothes washer). Reference: Section 708.1.1, IPC 2018. 6. Correct the washing machine box detail on sheet P0.1 to show a vent for the standpipe trap. Reference Section 909.2, IPC 2018. 7. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. |
| 06/19/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The City of Tucson has adopted the 2018 IMC as the approved method for calculating ventilation requirements. 2. Correct the duct for the return air grille located near the west exit: it is shown connecting to the supply air duct. 3. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018. 4. Show that the proposed replacement rooftop units meet the requirements of Sections C403.3, C403.4, and C403.5 (e.g. provide the mechanical compliance certification from COMcheck). Reference: Section C501.4, International Energy Conservation Code 2018. 5. Show that each rooftop unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and automatic start-up control (i.e. the thermostat is capable of automatically adjusting the start time of the HVAC equipment in order to bring the interior conditions to the desired temperature at the start of occupancy) and, the automatic changeover from the heating and cooling modes restricts set point overlap. Reference: Section C403.4.2 through C403.4.2.3, IECC 2018. 6. Condensate drains shall be terminated at an approved disposal location. Reference: Section 307.2.1, IMC 2018, as amended by the City of Tucson. 7. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). Reference: Section 403.2.1 (4), IMC 2018. 8. Revise the design for the termination of the clothes dryer exhaust to include a backdraft damper. Reference: Section 504.4, IMC 2018. |
| 06/19/2020 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Tucson Water limits 5/8" water meters to maximum demand of 20-GPM. Show that the installation of the new plumbing fixtures will not cause the demand to exceed the allowable limit. Reference: Section 107.2.1, IBC 2018. |
| 07/02/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide for Tamper Resistant receptacles as required per NEC art 406.12(5), Please provide a note on the power plan to comply with NEC 517.13 for wiring methods. Ref; 2018 IBC 107.2.1, 2017 NEC |
| 07/07/2020 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 07/07/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 07/14/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet G0.0; Code Summary (Egress Capacity): The egress capacity is calculated for 17 occupants, while the total occupant load calculation indicates 25. Please clarify. 2. Sheet G0.1; Fixture Mounting Distances: Please indicate the location of the horizontal grab bar on the back wall per the ICC/ANSI Figure 604.5.2. 3. Sheet G0.3; Floor Plan: Per the IBC Section 1017.3, the exit access travel distance shall be measured along the natural and unobstructed path of horizontal and vertical (not diagonal) egress travel to an exit. Please revise this plan. 4. Sheet G0.3; Code Summary: The egress capacity is calculated for 17 occupants, while the total occupant load calculation indicates 25. Please clarify. 5. General: Please provide a site plan for this project. 6. General: Please provide a valuation (labor + materials) for this project. 7. General: Please provide written responses to all review comments. |
| 07/14/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |