Permit Number: T20CM03629
Parcel: 11709123A

Address:
246 W 22ND ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM03629
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/16/2020 JPEELDA1 FIRE REVIEW Approved
06/19/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
06/19/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
06/19/2020 ROBERT SHERRY WATER REVIEW Completed
07/02/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
07/07/2020 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Section Manager

PROJECT: Auto Rental and Sales LLC - 246 W 22nd St
T20CM03629 (DP20-0096)
Building Plan (1st Review)

TRANSMITTAL DATE: July 7, 2020

1. Zoning has reviewed the building plans for compliance with the submitted development package DP20-0096. While the building plans are consistent with the submitted DP as it relates to the zoning review purview of the building footprint, building height, square footage, site conditions etc., zoning cannot approve the building plans until the DP is approved and all PDSD Commercial Plans reviewers have approved the building plans.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
07/09/2020 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Development package DP20-0096 must be approved first.
2. Show how roof drainage will not be directed onto the sidewalk. (TS 7-01.4.1.E)
07/13/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A1: Please provide a Code Analysis for the proposed addition on this sheet (Occupancy Classification, Construction Type, Total Building Occupant Load for existing portion + new portion, and Total Building SF for existing portion + new portion).
2. Sheet A1: Please provide calculations on this sheet for the required plumbing fixtures. This should be for the total building occupant load.
3. Sheet A1; Framing Plan: A section cut at the existing wall and at the new west wall indicate 3/2; Please revise that reference.
4. Sheet A1; Plans: Please provide north arrows on all plans.
5. Sheet A1; Building Section A: Details at the top of the masonry walls indicate 1/2 and 2/2. Please revise those references.
6. Sheet A1; Building Section A: A detail at the bottom of the masonry wall indicates 1/1. Please revise that reference.
7. Sheet A2; Typical Masonry Reinforcement: The Typical CMU Wall Reinforcement Schedule indicates the typical 8" wall reinforcement as #5 @ 32" o.c. This does not match the structural calculations (#5 @ 16" o.c.). Please coordinate.
8. Sheet A2; Details 1, 2, 3, and 4: All details have a note at the roof deck "Nailing per general structural notes". The nailing note is not included in the structural notes. Please verify.
9. Sheet A3; Structural Notes (General): Note 8 indicates "This canopy is designed.....". Please remove that note as required.
10. Sheet A3; Structural Notes (Foundations): Note 1 indicates a soils report was used for the foundation design. Please provide that report for review.
11. Sheet A3; Structural Notes (Special Inspections): Please coordinate the special inspections listed in the separate sections of these notes (masonry, concrete, soils, and structural steel) and those special inspections listed under Special Inspections of the Structural Notes.
12. Structural Calculations; Page 2: A note indicates "By inspection, use 2- 3 1/2 x 3 1/2 x 3/8 LLV double angle lintels at man door 3'-0" opening". There is a structural calculation provided for that lintel. Please remove the "By inspection".
13. General: Please provide a valuation (labor + materials) for this project.
14. General: Please provide a Special Inspection Certificate with Parts A and B completed. This certificate may be found at www.tucsonaz.gov/PDSD.
15. General: Please provide written responses to all review comments.
07/13/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
03/10/2021 LBOWERS1 OUT TO CUSTOMER Passed