Permit Number: T20CM03594
Parcel: 12406132A

Address:
1050 E 8TH ST

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T20CM03594
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/30/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Previous Comment; Sheet A-101: Please provide the Icc/ANSI Figures 604.5.1 and 604.5.2 on this sheet, indicating grab bar dimensioned locations.
2. Previous Comment; Sheet A-101; First Floor Plan: Please indicate on this plan the Keynote references for all new interior walls.
3. Previous Comment; Sheet A-101; Keynote 12: Please provide wall elevations of the accessible shower per the ICC/ANSI Section 608, including dimensioned locations of the grab bars, shower control, and handshower. Indicate the seat location on the plan.
4. Previous Comment: The responses indicated the owner would submit a separate valuation for the Clubhouse/Fitness Center. That valuation must be provided in order to approve this permit.
5. General: Please provide written responses to all review questions.
12/21/2021 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change The Table of Contents on sheet AS-100 shows a Mechanical COMcheck and a Systems Design Report as attachments but they have not been submitted. In addition, nothing has been submitted to verify that alterations to the building envelope comply with the current energy code (e.g. COMcheck Envelope Compliance Certificate). [Second comment: Comment not addressed.] [Initial comment: Demonstrate energy code compliance for the alterations to the building envelope using calculations based on the current code. Reference: Sections C103.2, C303, C503.1, and C503.3, International Energy Conservation Code 2018.]
12/21/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
12/21/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Coordinate the architectural and plumbing requirements for the drinking fountain. The plumbing design calls for a dual-height drinking fountain with a bottle filler (P-4) but keynote 14 on sheet A-101 calls for only a bottle filler. [Second comment: All plumbing fixtures are to be labeled and listed (Sections 303.1 and 303.4, IPC 2018); drinking fountains shall be accessible (Section 410.3, IPC 2018); the lavatory and lavatory faucet shall comply with the requirements of Sections 419.6 (as amended by the City of Tucson), 607.1.2, IPC 2018, Section 404.5, IECC 2018; and the water closet shall comply with the requirements of Sections 425.2 and 425.3, IPC 2018.] [Initial comment: Provide specifications for the proposed plumbing fixtures. Reference: Sections 303.4 and 402, IPC 2018.]
12/23/2021 SSHIELD1 ENGINEERING REVIEW Passed
12/23/2021 STEVE SHIELDS ZONING REVIEW Approved
12/29/2021 JPEELDA1 FIRE REVIEW Approved