Review Details: RESUBMITTAL - TI ALL
Permit Number - T20CM03594
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/11/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | PREVIOUS COMMENTS NOT ADDRESSED: 1. Sheet AS-100: Please indicate all relevant codes on this sheet along with new material strengths (wood, masonry, concrete, reinforcing, steel, etc.). 2. Sheet A-101: Please provide a Code Analysis on this sheet for the Leasing Center (some is already included in the General Notes). Include the Occupancy Classification, Construction Type, Square Footage, Occupant Load, Sprinklers/No Sprinklers, and Exit Requirements (number of exits and exit width). Indicate there is no new work on the second floor. 3. Sheet A-101; General Notes (Note 3): This note indicates MEP trades will be design build. All design and drawings for these reviewers will be required on the permit drawings. 4. Sheet A-101; Keynotes: Please indicate in a note that not all Keynotes are includedon the plans and elevations on this sheet. 5. Sheet A-101; Keynotes: Keynote 21 references a drink rail at 42" above finish floor. Per the 2009 ICC/ANSI Section 902.4, this height must be between 28" and 34" above finish floor. Please revise. 6. Sheet A-101; First Floor Plan: Keynote 14 references a bottle filling station at accessible height. Please indicate a spout height of 36" maximum above finish floor per ICC/ANSI Section 602.4. 7. Sheet A-101; First Floor Plan: Keynote 13 references a bench mounting height at accessible height. Please indicate a bench height between 17" and 19" above finish floor per ICC/ANSI Section 903.5. 8. Sheet A-101; First Floor Plan: Keynote 11 references an accessible height toilet. Please indicate a seat height between 17" and 19" above finish floor per ICC/ANSI Figure 604.4. 9. Sheet A-101; First Floor Plan: Keynote 12 references accessible shower, grab bars, seats, and hand showers. Please add this information on Elevations per ICC/ANSI Section 608. 10. Sheet A-101; First Floor Plan: Please add Keynotes to this plan at all new interior walls. 11. Sheet A-101: Please indicate restroom grab bars by adding ICC/ANSI Figures 604.5.1 and 604.5.2 on this sheet. 12. General: Please provide a valuation (labor + materials) for this project. 13. General: Please provide written responses to all review comments. |
02/11/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Initial comment: Demonstrate energy code compliance for the alterations to the building envelope using calculations based on the current code. Reference: Sections C103.2, C303, C503.1, and C503.3, International Energy Conservation Code 2018.] 2. Comment not addressed. [Initial comment: Provide construction documents drawn to scale and with sufficient detail and clarity to demonstrate that any proposed mechanical work complies with the applicable codes. Reference: Section 107.2.1, IBC 2018.] |
02/11/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Initial comment: Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2018.] 2. All plumbing fixtures are to be labeled and listed (Sections 303.1 and 303.4, IPC 2018); drinking fountains shall be accessible (Section 410.3, IPC 2018); the lavatory and lavatory faucet shall comply with the requirements of Sections 419.6 (as amended by the City of Tucson), 607.1.2, IPC 2018, Section 404.5, IECC 2018; and the water closet shall comply with the requirements of Sections 425.2 and 425.3, IPC 2018. [Initial comment: Provide specifications for the proposed plumbing fixtures. Reference: Sections 303.4 and 402, IPC 2018.] |
02/22/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL PROJECT: Wildcat Leasing and Fitness Remodel T20CM03594 (2nd Review) 1050 E 8th Ave TRANSMITTAL DATE: February 22, 2021 1. Zoning has reviewed the building plans but until DP19-0261 has been approved Zoning cannot approve the building plans. Also unit all other PDSD Commercial Plans reviewers have approved the building plans Zoning cannot approve. If you have any questions about this transmittal, please contact Elisa Hamblin, Elisa.Hamblin@tucsonaz.gov |
02/22/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following Electrical Plan Review comments. Provide a written response. The previous Electrical comments were not addressed and the written response could not be located in the second plan submittal documents. See previous Electrical plan review comments. |
03/01/2021 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Plans shall indicate codes being used ie: IEBC, IFC, IBC and so on Plans shall indicate the type of building construction Plans shall indicate if the building has fire sprinklers |
03/19/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | THE DEVELOPMENT PACKAGE MUST BE APPROVED FIRST. PLEASE PROVIDE PROJECT VALUATION FOR FLOODPLAIN USE PERMIT. |