Permit Number: T20CM03570
Parcel: 132169130

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM03570
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/11/2020 MALLORY RESS ZONING REVIEW Approved
06/11/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
06/11/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
06/11/2020 JOHN VAN WINKLE ENGINEERING REVIEW Passed
06/11/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A2; Ceiling Plan: Since the occupant load is greater than 49, a minimum of two exits are required. The Ceiling Plan only indicates one exit sign. Please verify.
2. Sheet A4 (Enlarged Restroom Plan 7); Sheet A4 (Elevation 8): Since two restrooms are required for each sex (27 occupants each), Elevation 8 should not be titled as Unisex. One accessible restroom shall be noted as male, and one as female. Please verify.
3. Sheet A4; Elevation 11(B): Please indicate a vertical grab bar per the ICC/ANSI Figure 604.5.2. Verify.
4. General: Please provide structural calculations for all new construction indicated on structural sheets S0 and S1.
5. General: Please verify the B Occupancy Classification for a behavioral health facility.
6. General: Please provide a Special Inspection Certificate with Parts A and B completed.
7. General: Please provide written responses to all review comments.
06/11/2020 ROBERT SHERRY WATER REVIEW Completed
06/11/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Clarify the description of water closet P-2 and show how the tank for will be accessed for maintenance. By definition, water closet P-2 is not a "private" fixture. Reference: Section 107.2.1, IBC 2018.
2. Provide the specifications for the proposed roof overflow drain and its published flow rate. Reference: Sections 1102.6 and 1105.2, IPC 2018.
3. Provide the opening dimensions for the proposed roof scupper. Reference: Section 1106.5, IPC 2018.
06/11/2020 JPEELDA1 FIRE REVIEW Approved
06/11/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed