06/11/2020 | MALLORY RESS | ZONING | REVIEW | Approved | |
06/11/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
06/11/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/11/2020 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Passed | |
06/11/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A2; Ceiling Plan: Since the occupant load is greater than 49, a minimum of two exits are required. The Ceiling Plan only indicates one exit sign. Please verify. 2. Sheet A4 (Enlarged Restroom Plan 7); Sheet A4 (Elevation 8): Since two restrooms are required for each sex (27 occupants each), Elevation 8 should not be titled as Unisex. One accessible restroom shall be noted as male, and one as female. Please verify. 3. Sheet A4; Elevation 11(B): Please indicate a vertical grab bar per the ICC/ANSI Figure 604.5.2. Verify. 4. General: Please provide structural calculations for all new construction indicated on structural sheets S0 and S1. 5. General: Please verify the B Occupancy Classification for a behavioral health facility. 6. General: Please provide a Special Inspection Certificate with Parts A and B completed. 7. General: Please provide written responses to all review comments. |
06/11/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/11/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the description of water closet P-2 and show how the tank for will be accessed for maintenance. By definition, water closet P-2 is not a "private" fixture. Reference: Section 107.2.1, IBC 2018. 2. Provide the specifications for the proposed roof overflow drain and its published flow rate. Reference: Sections 1102.6 and 1105.2, IPC 2018. 3. Provide the opening dimensions for the proposed roof scupper. Reference: Section 1106.5, IPC 2018. |
06/11/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
06/11/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |