Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM03569
Parcel: 12701003W

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM03569
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/11/2020 MALLORY RESS ZONING REVIEW Approved
06/11/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Verify that the background used for mechanical ceiling plan on M1 is coordinated with the architectural floor plan (e.g. room 107 is a call center on the mechanical plans but it is a closet on the architectural floor plans. Reference: Section 107.2.1, IBC 2018.
2. Provide justification for using "office" as the use for room 107 (room 110?) in the ventilation calculations rather than "call center." Reference: Section 403.3.1.1, IMC 2018.
3. Provide justification for using "office" as the use for room 101 in the ventilation calculations rather than "conference room." Reference: Section 403.3.1.1, IMC 2018.
4. What is the purpose of the un-numbered room served by FC-8? (Fan coils FC-5 and FC-6 serve the call center.) Reference: Section 107.2.1, IBC 2018.
06/11/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
06/11/2020 JOHN VAN WINKLE ENGINEERING REVIEW Passed
06/11/2020 DAN SANTA CRUZ BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A-1 (Floor Plan); Sheet A-2 (Ceiling Plan): On the Floor Plan, there is an existing Door 103 indicated (at Corridor 103). The Ceiling Plan does not indicate an exit light at that location. Please verify.
2. Sheet A-4: Please add an elevation to this sheet indicating the location of the rear wall grab bar for the water closet per the ICC/ANSI Figure 604.5.2.
3. General: Please provide written responses to all review comments.
06/11/2020 ROBERT SHERRY WATER REVIEW Completed
06/11/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
06/11/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
06/16/2020 ARUIZ1 FIRE REVIEW Needs Review