Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM03485
Parcel: 110120950

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM03485
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/24/2020 JPEELDA1 FIRE REVIEW Approved
07/02/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change If the showers do not have prefabricated receptors, provide details to show that the receptor construction complies with the requirements of Section 421.5, IPC 2018.
07/02/2020 ROBERT SHERRY WATER REVIEW Completed
07/02/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Clarify the design of the dryer exhaust system. The mechanical ceiling plan calls out the vent termination as EF-2; coordinate detail 101 with the dryer fan schedule. Reference: Section 107.2.1, IBC 2018.
2. Show that the exhaust flow rate for each of the four new restrooms complies with the requirements of Table 403.3.1.1, IMC 2018
07/06/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
07/14/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet TS1; Code Study (Plumbing Fixtures): This section indicates 2 existing water closets and 2 existing lavatories. Please add verbiage indicating 1 new women's water closet and lavatory, and 1 new men's water closet and lavatory have been added.
2. Sheet D1; Plans: Please provide a north arrow on the Key Plan and the Demolition Floor Plan.
3. Sheet D1; Demolition Floor Plan: There are several locations where a dashed wall (existing construction to be removed) is referenced by a Key Note D6.1 (existing interior wall to remain). Please coordinate.
4. Sheet D1; Demolition Floor Plan: There are a few locations where a dashed counter top and cabinetry (existing construction to be removed) is referenced by a Key Note D6.5 (existing cabinetry and counter top to remain). Please coordinate.
5. Sheet D1.1; Plans: Please provide a north arrow on the Key Plan and the Reflected Ceiling Plan.
6. Sheet A1; Plans: Please provide a north arrow on the Key Plan and the Floor Plan.
7. Sheet A2; Plans: Please provide a north arrow on the Key Plan and the Reflected Ceiling Plan.
8. Sheet A2; Relfected Ceiling Plan: Please indicate the exit lights on the Reflected Ceiling Plan.
9. General: Please provide an Egress Plan for this project, indicating allowable and actual exit access travel distances per the IBC Section 1017.
10. General: Please provide written responses to all review comments.