Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM03407
Parcel: 12701008A

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T20CM03407
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/24/2020 JPEELDA1 FIRE REVIEW Approved
07/01/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide the civil drawings noted on sheet P101 showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2018.
2. Provide the civil drawings noted on sheet P101 showing the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2018.
07/01/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Clarify the intended scope of the mechanical systems. If the mechanical units shown on sheet P101 are to be installed, demonstrate energy code compliance for the building envelope using calculations based on the current code and specify the units being installed. Reference: Sections C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2018
07/01/2020 ROBERT SHERRY WATER REVIEW Completed
07/02/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
07/06/2020 JOHN VAN WINKLE ENGINEERING REVIEW Approved
07/13/2020 STEVE SHIELDS ZONING REVIEW Approved
07/16/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheets A-1 through A-9: The architectural seal does not indicate a date when it was signed. Please provide.
2. Sheet A-2; Site Plan/Flatwork Keynotes: Note 101 references Detail 11/A3. Please revise that reference.
3. Sheet A-2; Site Plan/Flatwork Keynotes: Please complete Note 132.
4. Sheet A-2; Site Plan/Flatwork: Please add a north arrow to the plan.
5. Sheet A-3; Floor Plan General Notes: Note 1 references Sheet A-7 for the Door Schedule. Please revise that reference.
6. Sheet A-3; Floor Plan General Notes: Note 4 references Sheet A-4 for Exterior Elevations. Please revise that reference.
7. Sheet A-3; Floor Plan General Notes: Note 8 references Sheet A-7 for Glass Types. Please revise that reference.
8. Sheets A-3 and A-4; Floor Plan and RCP Keynotes: Note 141 references this sheet for Trellis Details. Please revise that reference.
9. Sheet A-3; Floor Plan Keynotes: Note 204 references a Soils Report. Please provide that report for review.
10. Sheet A-3; Floor Plan Keynotes: Note 206 references Mechanical Drawings for the electric Panel. Please revise that reference.
11. Sheet A-3; First Floor Plan: Please add a north arrow to this plan.
12. Sheet A-3; Partition Schedule: Partition W2 was not located on the plan. Please verify.
13. Sheet A-4; First Floor RCP: Please add a north arrow to this plan.
14. Sheet A-5; Roof Plan: Please add a north arrow to this plan.
15. Sheet A-5; Roof Plan Keynotes: Note 505 references Cricket Detail 5/A4. Please revise that reference.
16. Sheet A-5; Roof Plan: Please extend the Building Section D/A-8 through the entire canopy.
17. Sheet A-5; Detail 8: This detail cut was not located on the plan. Please verify.
18. Sheet A-7; Elevation Keynotes: Please complete Note 132.
19. Sheets A-7 and A-8; Elevation Keynotes: Note 141 references this sheet for Trellis Details. Please revise that reference.
20. Sheet S1.0; General Structural Notes (Foundations): Note 1 indicates a geotechnical report was used for the foundation design. Please provide that report for review.
21. Sheet S1.4; Typical Details: It appears Detail 24 (masonry lintel) should be designated as Detail 14. Please verify.
22. Sheet S1.5; Typical Details: It appears the detail at the masonry column did not get numbered in the title. Please provide.
23. Sheet S1.5 (Column Schedule); Structural Calculations (Pages 59 and 60): Please verify the base plates for the C1 and C2 columns on the drawings are not reversed from the calculations.
24. Sheet S2.0; Framing Plan: Please indicate on the plan the joists between Grids D and E and between Grids 2 and 4 should be designated as J1. Please verify.
25. General: The Special Inspection Certificate does not have Earthwork included, while the structural drawings do indicate Earthwork should be a special inspection. Please coordinate.
26. General: Please provide written responses to all review comments.
07/16/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/03/2020 SROGERS2 OUT TO CUSTOMER Completed