Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM03313
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/01/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/01/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide labels for the existing rooftop units to coordinate the ventilation calculations (called "Outside Cooling Calculations" on sheet M1.0). Reference: Section 107.2.1, IBC 2018. 2. Show the balancing data for the supply diffusers on the mechanical plan. Reference: Section 107.2.1, IBC 2018. |
06/01/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. If the shower does not have a pre-fabricated receptor, provide details to show that the construction of the receptor complies with the requirements of Section 421.5, IPC 2018. (Note: shower is labeled as a mop sink on P1.0) 2. Provide shower valves that comply with the requirements of Section 412.3 and 424.5, IPC 2018. |
06/01/2020 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/01/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/03/2020 | SAMUEL ROGERS | ZONING | REVIEW | Approved | |
06/03/2020 | SROGERS2 | ENGINEERING | REVIEW | Passed | |
06/05/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet TS1; Code Review: Phase II and Phase III are listed in the Code Review. Will these be completed under separate permits? Please indicate on the drawings. 2. Sheet TS1; Code Review: Please provide the calculations on this sheet for the plumbing fixture requirements per the IBC Section 2902.1.1. 3. Sheet TS1; Code Review: Plumbing fixture requirements for Phases II and III must be calculated for the future permits per the IBC Section 2902.1.1. 4. Sheet A1.0; Floor Plan: Please indicate on this sheet that work (as indicated) may not be performed on an portions of Phase II or III under this permit. 5. Sheet A1.0; Floor Plan: Please indicate the new partition walls stud size and spacing. Provide a detail for bracing all new partitions that do not extend to the roof deck. 6. Sheet A1.0; Floor Plan: Is the shower unit in Phase II? Please verify. 7. Sheet A2.0; Reflected Ceiling Plan: Please indicate the exit lights on this plan. 8. General: Please provide elevations for the grab bars in the restrooms per the ICC/ANSI Figures 604.5.1 and 604.5.2. 9. General: Please provide written responses to all review comments. |
06/05/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |