Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T20CM03224
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/31/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A2; Floor Plan: Per the IBC Section 1109.11, seating at the counter (Section 3/A6) shall have at least 5% of the standing/seating spaces accessible (minimum 1 space) with a counter height of 34" maximum per the ICC/ANSI Section 902.4. Please revise the plan. 2. Sheet A2; Floor Plan: Per the IBC Section 1109.11, seating at the tables shall have at least 5% accessible (minimum 1 table) with the table height of 34" maximum per the ICC/ANSI Section 902.4. Please indicate on the plan. 3. Sheet A2; Floor Plan: Per the IBC Section 1109.12.3 and the ICC/ANSI Section 904, sales and service counters must be accessible. Please indicate on this sheet the counter height at this location is a maximum of 36". 4. Sheet A1; Provide an updated restroom calculation for the total occupant load. 5. General: Please provide a revised project valuation which includes the addition of the retail space. 6. General: Please provide written responses to all review comments. |
08/31/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
08/31/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Coordinate the plumbing and mechanical designs by deleting the plan call-outs and detail of the water heater flue on sheets M1 and M3. Reference: Section 107.2.1, IBC 2018. |
08/31/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments also provide a written response. Ref; Plan Sheet E4.0, E5.0. The two electrical single line diagrams do not correlate with each other. It appears that they have completely different configurations. Please clarify. Identify what is new and what is existing in the line diagram on plan sheet E4.0. Why doesn't the load summary on plan sheet E5.0 include panels ‘K’ and ‘M’ ? Provide GFI protection for all receptacles in the kitchen and food prep areas per NEC 210.8B. Is panel ‘K’ new or existing ? Plan sheet E3.0 has an (E) by it, but the panel schedule does not indicate either. But it shows panel ‘M’ as existing. Please be consistent. Identify the what each column represents for the IECC considerations on plan sheet E3.0. Is all power and lighting new in both spaces T-8 and T-9? Ref; 2018 IBC 107.2.1, 2017 NEC, 2018 IECC, 2012 Tucson/Pima County Outdoor Lighting Code, City of Tucson Commercial Plan Submittal Requirements. |
08/31/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
09/02/2021 | JVINCEN1 | FIRE | REVIEW | Approved | |
10/06/2021 | EHAMBLI1 | DESIGN PROFESSIONAL | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/07/2021 | VVERA1 | OUT TO CUSTOMER | Completed |