Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM03224
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/27/2020 | SARAH MEGGISON | ZONING | REVIEW | Approved | |
05/27/2020 | SMEGGIS1 | ENGINEERING | REVIEW | Passed | |
05/27/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide for GFI protection for ALL single phase receptacles rated 150 volts to ground, 50 amps or less in the kitchen and food prep areas, Per NEC 210.8B. 2. The panels shown on the one line diagram do not correlate with the panels shown on the electrical floor plan. Please clarify. 3. What is the amp rating of panel 'K'? 4. The circuit numbers for HP1,2,3, shown on the floor plan does not correlate with the panel schedule. 5. Provide complete electrical load calculations. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
05/27/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A2; Floor Plan: A note on the west exterior wall indicates "Outdoor patio not a part of scope of work". The occupant load at the patio should be indicated on this permit and added to the interior occupant load if the patio is an existing area. Plumbing fixtures are calculated on the total occupant load. Please verify. 2. Sheet A5; Exhaust Hood Detail: Please indicate how the 2-2x12 support beams are connected to the partition at each end (drawing indicates 2x4 18 gauge studs under each beam). 3. General: Please provide a Special Inspection Certificate with Parts A and B completed. 4. General: Please provide written responses to all review comments. |
05/27/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Coordinate the plumbing and architectural water heater support details. Provide structural calculations for the mounting shelf for the water heater to show that the water heater will be safely supported from the building structure. Reference: Section 301.2, IPC 2018. 2. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. |
05/27/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
06/09/2020 | JPEELDA1 | FIRE | REVIEW | Approved | Patio shows that it has been removed. If the patio were to be added in the future, the occupant load would be increased and they would need to sprinkler the space. |
06/16/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
06/16/2020 | ROBERT SHERRY | WATER | REVIEW | Completed |